1995Water Science & TechnologyRequires access

Domestic wastewater treatment through constructed wetland in India

Author information unavailable

Open publisher page 95 citations

Abstract

The paper highlights the use of constructed wetlands for the removal of BOD, nitrogen, phosphorus and pathogens from primary treated wastewater. The constructed wetland consists of emergent macrophytes Typha latifolia and Phragmites carca grown in cement pipes having 0.1256 m 2 area and 0.8 meter deep filled with 30% soil and 70% sand. The hydraulic loadings were maintained at the rate of 5 cm per day. The BOD removal in wetlands was observed to be 78-91%. The nitrogen content reduced from 30.8 mgl −1 to 9.5 mgl −1 whereas phosphate in treated wetland effluent was 9.6 mgl −1 as against the mean inflow total phosphate content of 14.9 mgl −1 . The country’s first constructed wetland, of 90m × 30m size, was installed at Sainik School, Bhubaneshwar in the State of Orissa. Two types of macrophytes, viz. Typha latifolia and Phragmites carca , were planted. At present 180-200 m 3 wastewater is being treated through wetland. BOD and nitrogen removal were 67-90% and 58-63% respectively. The constructed wetland treatment was found to be efficient in removal of BOD and N, and economically viable. The system, being easy to operate and low cost, can provide an economical viable solution for wastewater management.

About this research paper

What this paper is about

The paper highlights the use of constructed wetlands for the removal of BOD, nitrogen, phosphorus and pathogens from primary treated wastewater. The constructed wetland consists of emergent macrophytes Typha latifolia and Phragmites carca grown in cement pipes having 0.1256 m 2 area and 0.8 meter deep filled with 30% soil and 70% sand. The hydraulic loadings were maintained at the rate of 5 cm per day. The BOD removal in wetlands was observed to be 78-91%. The nitrogen content reduced from 30.8 mgl −1 to 9.5 mgl −1 whereas phosphate in treated wetland effluent was 9.6 mgl −1 as against the mean inflow total phosphate content of 14.9 mgl −1 . The country’s first constructed wetland, of 90m × 30m size, was installed at Sainik School, Bhubaneshwar in the State of Orissa. Two types of macrophytes, viz. Typha latifolia and Phragmites carca , were planted. At present 180-200 m 3 wastewater is being treated through wetland. BOD and nitrogen removal were 67-90% and 58-63% respectively. The constructed wetland treatment was found to be efficient in removal of BOD and N, and economically viable. The system, being easy to operate and low cost, can provide an economical viable solution for wastewater management.

Why it matters

OpenAlex reports 95 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper highlights the use of constructed wetlands for the removal of BOD, nitrogen, phosphorus and pathogens from primary treated wastewater. The constructed wetland consists of emergent macrophytes Typha latifolia and Phragmites carca grown in cement pipes having 0.1256 m 2 area and 0.8 meter deep filled with 30% soil and 70% sand. The hydraulic loadings were maintained at the rate of 5 cm per day. The BOD removal in wetlands was observed to be 78-91%. The nitrogen content reduced from 30.8 mgl −1 to 9.5 mgl −1 whereas phosphate in treated wetland effluent was 9.6 mgl −1 as against the mean inflow total phosphate content of 14.9 mgl −1 . The country’s first constructed wetland, of 90m × 30m size, was installed at Sainik School, Bhubaneshwar in the State of Orissa. Two types of macrophytes, viz. Typha latifolia and Phragmites carca , were planted. At present 180-200 m 3 wastewater is being treated through wetland. BOD and nitrogen removal were 67-90% and 58-63% respectively. The constructed wetland treatment was found to be efficient in removal of BOD and N, and economically viable. The system, being easy to operate and low cost, can provide an economical viable solution for wastewater management.

Key concepts: Wetland, Wastewater, Sewage treatment, Environmental science, Environmental engineering, Water resource management, Constructed wetland, Waste management

Related papers

Back to paper searchBrowse research topicsOriginal source
Domestic wastewater treatment through constructed wetland in India — Research Paper | ScholarLens