Low Strain Integrity Testing of Piles: Three-Dimensional Effects
Y. K. Chow, Kok‐Kwang Phoon, Wei-Yih Chow, Kit Yi Angel Wong
Abstract
Y. K. Chow, Kok‐Kwang Phoon, Wei-Yih Chow, Kit Yi Angel Wong
Abstract
Results of low strain integrity testing of piles are normally interpreted using one-dimensional (1D) stress wave theory. While 1D stress wave theory is acceptable for pile-driving analysis, it may not adequately simulate the response of piles in sonic integrity tests where the hammer is small in relation to the size of the pile. Extensive parametric studies were performed using 1D and 3D (axisymmetric) wave equation models to study this problem. The main 3D effect in intact piles lies in the initial velocity response that becomes negative after the first positive peak. This response resembles that of a pile with an anomaly near the pile head. If this is not recognized, it will lead to a wrong assessment of the pile condition with attendant cost implications. This potential source of error can be removed by maintaining a distance between hammer and receiver that is greater than 50% of the pile radius.
OpenAlex reports 110 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Results of low strain integrity testing of piles are normally interpreted using one-dimensional (1D) stress wave theory. While 1D stress wave theory is acceptable for pile-driving analysis, it may not adequately simulate the response of piles in sonic integrity tests where the hammer is small in relation to the size of the pile. Extensive parametric studies were performed using 1D and 3D (axisymmetric) wave equation models to study this problem. The main 3D effect in intact piles lies in the initial velocity response that becomes negative after the first positive peak. This response resembles that of a pile with an anomaly near the pile head. If this is not recognized, it will lead to a wrong assessment of the pile condition with attendant cost implications. This potential source of error can be removed by maintaining a distance between hammer and receiver that is greater than 50% of the pile radius.
Key concepts: Pile, Hammer, Geotechnical engineering, Parametric statistics, Structural engineering, Head (geology), RADIUS, Stress (linguistics)