Alabama Electric Cooperative Flue Gas Desulfurization Operating and Maintenance Experience
C.A. Johnson, Royce Hutcheson
Abstract
Open-access reader
C.A. Johnson, Royce Hutcheson
Abstract
Open-access reader
Alabama Electric Cooperative, Leroy, AL, has recently started up two 255 MW units, including a flue gas desulfurization system, at their Tomblgbee Station. The flue gas desulfurization system was designed by Peabody Process Systems, Inc., Stamford, CT. After 20 months operation, performance, in terms of start-up operations and maintenance, has been exceptionally good. This paper discusses those design factors which contributed to this successful performance.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Alabama Electric Cooperative, Leroy, AL, has recently started up two 255 MW units, including a flue gas desulfurization system, at their Tomblgbee Station. The flue gas desulfurization system was designed by Peabody Process Systems, Inc., Stamford, CT. After 20 months operation, performance, in terms of start-up operations and maintenance, has been exceptionally good. This paper discusses those design factors which contributed to this successful performance.
Key concepts: Flue-gas desulfurization, Flue gas, Waste management, Environmental science, Engineering