1999Hydrological ProcessesRequires access

Downstream change in river bank erosion rates in the Swale-Ouse system, northern England

Damian Lawler, James Grove, John Couperthwaite, G. J. L. Leeks

Open publisher page 178 citations

Abstract

Few studies have considered downstream changes in bank erosion rates and variability along single river systems. This paper reports some preliminary results of an intensive and direct field monitoring exercise of bank erosion rates on 11 sites along 130 km of the 3315 km2 Swale-Ouse river system in northern England over a 14·5 month period. Data were collected at active sites using grid networks of erosion pins read at c. 18–30 day intervals and bank-line resurveys. Erosion rates were relatively high for a river of this scale: spatially averaged bank erosion magnitudes over the 14·5 months varied from 82·7 mm to 440·1 mm, although at one highly mobile reach retreat of 1760 mm was recorded over 4 months. Bank erosion rates tended to peak in mid-basin, possibly because of an optimum combination there of high stream powers and erodible bank materials, as predicted theoretically by Lawler (1992, 1995). The piedmont (upland–lowland transition) zone was especially active. Graphical erosion representations for specific periods, however, showed that bank retreat was often highly localized within individual sites. Strong seasonal variations in erosion rate were also observed with a significant winter (December–March) peak. A novel finding, however, was the apparent downstream increase in the length of the erosion ‘season’, with measurable retreat occurring at the lower sites from September to July. This is interpreted as a reflection of a richer mix of bank erosion processes at the downstream sites, where mass failure, fluid entrainment and weathering processes are all active, with each process group having its own, but overlapping, temporal (seasonal) domain. Copyright © 1999 John Wiley & Sons, Ltd.

About this research paper

What this paper is about

Few studies have considered downstream changes in bank erosion rates and variability along single river systems. This paper reports some preliminary results of an intensive and direct field monitoring exercise of bank erosion rates on 11 sites along 130 km of the 3315 km2 Swale-Ouse river system in northern England over a 14·5 month period. Data were collected at active sites using grid networks of erosion pins read at c. 18–30 day intervals and bank-line resurveys. Erosion rates were relatively high for a river of this scale: spatially averaged bank erosion magnitudes over the 14·5 months varied from 82·7 mm to 440·1 mm, although at one highly mobile reach retreat of 1760 mm was recorded over 4 months. Bank erosion rates tended to peak in mid-basin, possibly because of an optimum combination there of high stream powers and erodible bank materials, as predicted theoretically by Lawler (1992, 1995). The piedmont (upland–lowland transition) zone was especially active. Graphical erosion representations for specific periods, however, showed that bank retreat was often highly localized within individual sites. Strong seasonal variations in erosion rate were also observed with a significant winter (December–March) peak. A novel finding, however, was the apparent downstream increase in the length of the erosion ‘season’, with measurable retreat occurring at the lower sites from September to July. This is interpreted as a reflection of a richer mix of bank erosion processes at the downstream sites, where mass failure, fluid entrainment and weathering processes are all active, with each process group having its own, but overlapping, temporal (seasonal) domain. Copyright © 1999 John Wiley & Sons, Ltd.

Why it matters

OpenAlex reports 178 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Few studies have considered downstream changes in bank erosion rates and variability along single river systems. This paper reports some preliminary results of an intensive and direct field monitoring exercise of bank erosion rates on 11 sites along 130 km of the 3315 km2 Swale-Ouse river system in northern England over a 14·5 month period. Data were collected at active sites using grid networks of erosion pins read at c. 18–30 day intervals and bank-line resurveys. Erosion rates were relatively high for a river of this scale: spatially averaged bank erosion magnitudes over the 14·5 months varied from 82·7 mm to 440·1 mm, although at one highly mobile reach retreat of 1760 mm was recorded over 4 months. Bank erosion rates tended to peak in mid-basin, possibly because of an optimum combination there of high stream powers and erodible bank materials, as predicted theoretically by Lawler (1992, 1995). The piedmont (upland–lowland transition) zone was especially active. Graphical erosion representations for specific periods, however, showed that bank retreat was often highly localized within individual sites. Strong seasonal variations in erosion rate were also observed with a significant winter (December–March) peak. A novel finding, however, was the apparent downstream increase in the length of the erosion ‘season’, with measurable retreat occurring at the lower sites from September to July. This is interpreted as a reflection of a richer mix of bank erosion processes at the downstream sites, where mass failure, fluid entrainment and weathering processes are all active, with each process group having its own, but overlapping, temporal (seasonal) domain. Copyright © 1999 John Wiley & Sons, Ltd.

Key concepts: Bank erosion, Hydrology (agriculture), Erosion, Bank, Geology, Environmental science, Geomorphology, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Downstream change in river bank erosion rates in the Swale-Ouse system, northern England — Research Paper | ScholarLens