The Timing of Urban Rail Transit Construction Based on the Weighted Gray Correlation

Xiao Qiang Luo, Yanyong Guo, Yao Wu

Open full text 3 citations

Abstract

In order to clear rail lines of the construction of the timing, the need for each line analysis and evaluation of scientific and rational manner, thus forming a good construction planning program. Analysis of the impact of rail transit construction timing factors, and presented its quantitative methods; further established based on the weighted gray correlation of urban rail transit construction methods and sequence the steps to solve the model. Finally, an example of Xi'an rail transit network in the timing of the construction. The results show that the proposed method using the results of the same order with the actual construction, the method is simple and has good application prospects.

About this research paper

What this paper is about

In order to clear rail lines of the construction of the timing, the need for each line analysis and evaluation of scientific and rational manner, thus forming a good construction planning program. Analysis of the impact of rail transit construction timing factors, and presented its quantitative methods; further established based on the weighted gray correlation of urban rail transit construction methods and sequence the steps to solve the model. Finally, an example of Xi'an rail transit network in the timing of the construction. The results show that the proposed method using the results of the same order with the actual construction, the method is simple and has good application prospects.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to clear rail lines of the construction of the timing, the need for each line analysis and evaluation of scientific and rational manner, thus forming a good construction planning program. Analysis of the impact of rail transit construction timing factors, and presented its quantitative methods; further established based on the weighted gray correlation of urban rail transit construction methods and sequence the steps to solve the model. Finally, an example of Xi'an rail transit network in the timing of the construction. The results show that the proposed method using the results of the same order with the actual construction, the method is simple and has good application prospects.

Key concepts: Urban rail transit, Rail transit, Gray (unit), Engineering, Simple (philosophy), Transport engineering, Computer science, Philosophy