Forecasting of boro rice production in Bangladesh: An ARIMA approach
NMF Rahman
Abstract
Open-access reader
NMF Rahman
Abstract
Open-access reader
The study was undertaken to examine the best fitted ARIMA model that could be used to make efficient forecast boro rice production in Bangladesh from 2008-09 to 2012-13. It appeared from the study that local, modern and total boro time series are 1st order homogenous stationary. It is found from the study that the ARIMA (0,1,0) ARIMA (0,1,3) and ARIMA (0,1,2) are the best for local, modern and total boro rice production respectively. It is observed from the analysis that short term forecasts are more efficient for ARIMA models. The production uncertainty of boro rice can be minimizing if production can be forecasted well and necessary steps can be taken against losses. The government and producer as well use ARIMA methods to forecast future production more accurately in the short run. Keywords: Production; ARIMA model; Forecasting. DOI: 10.3329/jbau.v8i1.6406J. Bangladesh Agril. Univ. 8(1): 103-112, 2010
OpenAlex reports 27 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The study was undertaken to examine the best fitted ARIMA model that could be used to make efficient forecast boro rice production in Bangladesh from 2008-09 to 2012-13. It appeared from the study that local, modern and total boro time series are 1st order homogenous stationary. It is found from the study that the ARIMA (0,1,0) ARIMA (0,1,3) and ARIMA (0,1,2) are the best for local, modern and total boro rice production respectively. It is observed from the analysis that short term forecasts are more efficient for ARIMA models. The production uncertainty of boro rice can be minimizing if production can be forecasted well and necessary steps can be taken against losses. The government and producer as well use ARIMA methods to forecast future production more accurately in the short run. Keywords: Production; ARIMA model; Forecasting. DOI: 10.3329/jbau.v8i1.6406J. Bangladesh Agril. Univ. 8(1): 103-112, 2010
Key concepts: Autoregressive integrated moving average, Production (economics), Box–Jenkins, Statistics, Mathematics, Time series, Econometrics, Economics