Research on Construction Control of Long-Span Prestressed Concrete Continuous Girder Bridge
He An Wan
Abstract
He An Wan
Abstract
On the background of 318 highway bridge of the Yinjiang Jihan Navigation Project, it introduces the methods and contents of the construction control of long-span prestressed concrete continuous girder bridge, it adopts Midas/Civil softwares to have a simulation analysis and effective control for the construction process of whole bridge. The result indicates that safety of the bridge construction, linear and the variation of prestress are all in control. Finally, the condition of structure of bridge suits for computational state theoretically.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
On the background of 318 highway bridge of the Yinjiang Jihan Navigation Project, it introduces the methods and contents of the construction control of long-span prestressed concrete continuous girder bridge, it adopts Midas/Civil softwares to have a simulation analysis and effective control for the construction process of whole bridge. The result indicates that safety of the bridge construction, linear and the variation of prestress are all in control. Finally, the condition of structure of bridge suits for computational state theoretically.
Key concepts: Bridge (graph theory), Structural engineering, Prestressed concrete, Girder bridge, Engineering, Span (engineering), Beam bridge, Box girder