2014Advanced materials researchRequires access

Research on Construction Control of Long-Span Prestressed Concrete Continuous Girder Bridge

He An Wan

Open publisher page 2 citations

Abstract

On the background of 318 highway bridge of the Yinjiang Jihan Navigation Project, it introduces the methods and contents of the construction control of long-span prestressed concrete continuous girder bridge, it adopts Midas/Civil softwares to have a simulation analysis and effective control for the construction process of whole bridge. The result indicates that safety of the bridge construction, linear and the variation of prestress are all in control. Finally, the condition of structure of bridge suits for computational state theoretically.

About this research paper

What this paper is about

On the background of 318 highway bridge of the Yinjiang Jihan Navigation Project, it introduces the methods and contents of the construction control of long-span prestressed concrete continuous girder bridge, it adopts Midas/Civil softwares to have a simulation analysis and effective control for the construction process of whole bridge. The result indicates that safety of the bridge construction, linear and the variation of prestress are all in control. Finally, the condition of structure of bridge suits for computational state theoretically.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

On the background of 318 highway bridge of the Yinjiang Jihan Navigation Project, it introduces the methods and contents of the construction control of long-span prestressed concrete continuous girder bridge, it adopts Midas/Civil softwares to have a simulation analysis and effective control for the construction process of whole bridge. The result indicates that safety of the bridge construction, linear and the variation of prestress are all in control. Finally, the condition of structure of bridge suits for computational state theoretically.

Key concepts: Bridge (graph theory), Structural engineering, Prestressed concrete, Girder bridge, Engineering, Span (engineering), Beam bridge, Box girder

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Construction Control of Long-Span Prestressed Concrete Continuous Girder Bridge — Research Paper | ScholarLens