Accelerated Construction for a Medium-Span Bridge in Thailand with the Precast Segmental Approach

Chakree Bamrungwong, Jirasak Thongsom, Kitti Manokhoon, Walawat Binuma, Wichai Kijawatworawet, Putthipong Haleerattanawattana

Open publisher page 1 citations

Abstract

It is well realized that difficulties in quality control of casting concrete on site and incapability of delivery of long precast girders are the principal problems of medium-scale bridge construction in a far rural area. To get rid of these impedances, the precast segmental approach was adopted to construct a bridge with 20-meter span length in Sakhonnakorn Province, Thailand. Not only girders, but also piers and cap beams were separated into segments. Each segment was manufactured in a well quality-controlled casting yard and transported to construction site by trucks so that they would be assembled and installed. This paper will describe construction procedure with the precast segmental approach. It can be found, from the construction, that the precast segmental technique can reduce the construction period significantly. Moreover, the quality of construction was provided well.

About this research paper

What this paper is about

It is well realized that difficulties in quality control of casting concrete on site and incapability of delivery of long precast girders are the principal problems of medium-scale bridge construction in a far rural area. To get rid of these impedances, the precast segmental approach was adopted to construct a bridge with 20-meter span length in Sakhonnakorn Province, Thailand. Not only girders, but also piers and cap beams were separated into segments. Each segment was manufactured in a well quality-controlled casting yard and transported to construction site by trucks so that they would be assembled and installed. This paper will describe construction procedure with the precast segmental approach. It can be found, from the construction, that the precast segmental technique can reduce the construction period significantly. Moreover, the quality of construction was provided well.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It is well realized that difficulties in quality control of casting concrete on site and incapability of delivery of long precast girders are the principal problems of medium-scale bridge construction in a far rural area. To get rid of these impedances, the precast segmental approach was adopted to construct a bridge with 20-meter span length in Sakhonnakorn Province, Thailand. Not only girders, but also piers and cap beams were separated into segments. Each segment was manufactured in a well quality-controlled casting yard and transported to construction site by trucks so that they would be assembled and installed. This paper will describe construction procedure with the precast segmental approach. It can be found, from the construction, that the precast segmental technique can reduce the construction period significantly. Moreover, the quality of construction was provided well.

Key concepts: Precast concrete, Girder, Structural engineering, Bridge (graph theory), Span (engineering), Engineering, Truck, Casting

Related papers

Back to paper searchBrowse research topicsOriginal source
Accelerated Construction for a Medium-Span Bridge in Thailand with the Precast Segmental Approach — Research Paper | ScholarLens