The application of depot transfer/rendezvous in space based cyclic orbit missions

Randall E. Coffey

Open publisher page 1 citations

Abstract

Mission planning for future national space programs will seek means to abate the high dollar cost of mass delivery. To meet the fiscal objectives of these programs requires the development of improved transportation logistics, both in the primary Earth-to-Low Earth Orbit (LEO) and secondary orbit-to-orbit space transportation segments for delivery of construction materials, scientific payloads, and personnel. The deployment of space-based orbit transfer vehicles (OTV's) and development of innovative orbit transfer methodologies that reduce secondary cyclic mission support mass requirements (e.g. propellants) is a crucial step in meeting program budgetary goals. The research performed in this thesis has developed an improved efficiency cyclic orbit transfer method, based on non-traditional optimization criteria, through the use of intermediate propellant depot orbits and rendezvous transfer. The technique was optimized for a reference cyclic transfer between LEO and Geostationary Earth Orbit (GEO) in the presence of realistic mission affects including the following: (1) non-planar transfers; (2) perturbed (non-Keplerian) orbit motions; and (3) mission transfer risk mitigation techniques. A semianalytic model was developed to optimize the depot orbit selection and sizing for LEO/GEO cyclic missions for three NASA reference OTV mission payload profiles. The results demonstrated significant reductions in cyclic mission propellant requirements, when compared to current NASA aerobrake OTV missions, for durations of up to one week in GEO. The magnitude of the propellant mass savings was found to depend on GEO on-orbit durations, mission risk strategies, and payload profiles, with maximum propellant savings amounting to approximately 11 metric tons/mission. A first-order cost benefit analysis showed a recurring dollar savings from the use of the depot transfer/rendezvous method ranging from 5 to 83 million dollars per mission.

About this research paper

What this paper is about

Mission planning for future national space programs will seek means to abate the high dollar cost of mass delivery. To meet the fiscal objectives of these programs requires the development of improved transportation logistics, both in the primary Earth-to-Low Earth Orbit (LEO) and secondary orbit-to-orbit space transportation segments for delivery of construction materials, scientific payloads, and personnel. The deployment of space-based orbit transfer vehicles (OTV's) and development of innovative orbit transfer methodologies that reduce secondary cyclic mission support mass requirements (e.g. propellants) is a crucial step in meeting program budgetary goals. The research performed in this thesis has developed an improved efficiency cyclic orbit transfer method, based on non-traditional optimization criteria, through the use of intermediate propellant depot orbits and rendezvous transfer. The technique was optimized for a reference cyclic transfer between LEO and Geostationary Earth Orbit (GEO) in the presence of realistic mission affects including the following: (1) non-planar transfers; (2) perturbed (non-Keplerian) orbit motions; and (3) mission transfer risk mitigation techniques. A semianalytic model was developed to optimize the depot orbit selection and sizing for LEO/GEO cyclic missions for three NASA reference OTV mission payload profiles. The results demonstrated significant reductions in cyclic mission propellant requirements, when compared to current NASA aerobrake OTV missions, for durations of up to one week in GEO. The magnitude of the propellant mass savings was found to depend on GEO on-orbit durations, mission risk strategies, and payload profiles, with maximum propellant savings amounting to approximately 11 metric tons/mission. A first-order cost benefit analysis showed a recurring dollar savings from the use of the depot transfer/rendezvous method ranging from 5 to 83 million dollars per mission.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Mission planning for future national space programs will seek means to abate the high dollar cost of mass delivery. To meet the fiscal objectives of these programs requires the development of improved transportation logistics, both in the primary Earth-to-Low Earth Orbit (LEO) and secondary orbit-to-orbit space transportation segments for delivery of construction materials, scientific payloads, and personnel. The deployment of space-based orbit transfer vehicles (OTV's) and development of innovative orbit transfer methodologies that reduce secondary cyclic mission support mass requirements (e.g. propellants) is a crucial step in meeting program budgetary goals. The research performed in this thesis has developed an improved efficiency cyclic orbit transfer method, based on non-traditional optimization criteria, through the use of intermediate propellant depot orbits and rendezvous transfer. The technique was optimized for a reference cyclic transfer between LEO and Geostationary Earth Orbit (GEO) in the presence of realistic mission affects including the following: (1) non-planar transfers; (2) perturbed (non-Keplerian) orbit motions; and (3) mission transfer risk mitigation techniques. A semianalytic model was developed to optimize the depot orbit selection and sizing for LEO/GEO cyclic missions for three NASA reference OTV mission payload profiles. The results demonstrated significant reductions in cyclic mission propellant requirements, when compared to current NASA aerobrake OTV missions, for durations of up to one week in GEO. The magnitude of the propellant mass savings was found to depend on GEO on-orbit durations, mission risk strategies, and payload profiles, with maximum propellant savings amounting to approximately 11 metric tons/mission. A first-order cost benefit analysis showed a recurring dollar savings from the use of the depot transfer/rendezvous method ranging from 5 to 83 million dollars per mission.

Key concepts: Geostationary orbit, Orbit (dynamics), Propellant, Aerospace engineering, Payload (computing), Rendezvous, Spacecraft, Geosynchronous orbit

Related papers

Back to paper searchBrowse research topicsOriginal source
The application of depot transfer/rendezvous in space based cyclic orbit missions — Research Paper | ScholarLens