2002Revue de MétallurgieRequires access

LKAB's experimental blast furnace and pellet development

Mats Hallin, Lawrence Hooey, Jerker Sterneland, D. Thulin

Open publisher page 15 citations

Abstract

LKAB's experimental blast furnace with a hearth diameter of 1.2 m and a working volume of 8.2 m3 produces approximatively 35 tons of hot metal/day and, not the least, valuable information. The furnace is used for the evaluation of burden materials and combinations as well as of modified or new blast furnace operational concepts and equipments. Nine campaigns ranging from 6 to 11 weeks have been performed since the start up in 1997.

About this research paper

What this paper is about

LKAB's experimental blast furnace with a hearth diameter of 1.2 m and a working volume of 8.2 m3 produces approximatively 35 tons of hot metal/day and, not the least, valuable information. The furnace is used for the evaluation of burden materials and combinations as well as of modified or new blast furnace operational concepts and equipments. Nine campaigns ranging from 6 to 11 weeks have been performed since the start up in 1997.

Why it matters

OpenAlex reports 15 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

LKAB's experimental blast furnace with a hearth diameter of 1.2 m and a working volume of 8.2 m3 produces approximatively 35 tons of hot metal/day and, not the least, valuable information. The furnace is used for the evaluation of burden materials and combinations as well as of modified or new blast furnace operational concepts and equipments. Nine campaigns ranging from 6 to 11 weeks have been performed since the start up in 1997.

Key concepts: Blast furnace, Hearth, Pellet, Metallurgy, Environmental science, Materials science, Volume (thermodynamics), Waste management

Related papers

Back to paper searchBrowse research topicsOriginal source
LKAB's experimental blast furnace and pellet development — Research Paper | ScholarLens