2007항공우주기술Requires access

TRANSCOST 7.1을 적용한 실용위성 발사체 비용추정

서윤경, 오범석

Open publisher page 0 citations

Abstract

Space launch vehicle development needs many kinds of technologies synthetically. Nowadays, KARI (Korea Aerospace Research Institute) has developed a space launch vehicle, KSLV-I (Korea Space Launch Vehicle-I), that is able to load with an 100㎏ payload. After that it plans to develop Korean Space Launch Vehicle. As space launch vehicle becomes more complicate and larger, it needs a scientific and analytic development cost estimation. In this paper a cost estimation for KSLV-Ⅱ using TRANSCOST 7.1 was studied.

About this research paper

What this paper is about

Space launch vehicle development needs many kinds of technologies synthetically. Nowadays, KARI (Korea Aerospace Research Institute) has developed a space launch vehicle, KSLV-I (Korea Space Launch Vehicle-I), that is able to load with an 100㎏ payload. After that it plans to develop Korean Space Launch Vehicle. As space launch vehicle becomes more complicate and larger, it needs a scientific and analytic development cost estimation. In this paper a cost estimation for KSLV-Ⅱ using TRANSCOST 7.1 was studied.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Space launch vehicle development needs many kinds of technologies synthetically. Nowadays, KARI (Korea Aerospace Research Institute) has developed a space launch vehicle, KSLV-I (Korea Space Launch Vehicle-I), that is able to load with an 100㎏ payload. After that it plans to develop Korean Space Launch Vehicle. As space launch vehicle becomes more complicate and larger, it needs a scientific and analytic development cost estimation. In this paper a cost estimation for KSLV-Ⅱ using TRANSCOST 7.1 was studied.

Key concepts: Space launch, Payload (computing), Aerospace, Launch vehicle, Space (punctuation), Space Shuttle, Space vehicle, Aerospace engineering

Back to paper searchBrowse research topicsOriginal source
TRANSCOST 7.1을 적용한 실용위성 발사체 비용추정 — Research Paper | ScholarLens