1979OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

Oklahoma Natural Gas Co. lays new line to gas storage field

D. Dietsch

Open publisher page 0 citations

Abstract

A 43 mi long, 24 in. dia high-pressure natural gas pipeline was recently built for Oklahoma Natural Gas Co. by KM Engineering Co. and Nelson-Sikes Inc. The line extends through Logan, Kingfisher and Canadian Counties to tie in to the firm's underground storage facility near Edmond. The pipeline will deliver 100-150 million cu ft/day of gas. Two additional 1500 hp compressor units were installed to increase the Edmond underground storage capacity from 10 to 20 billion cu ft/yr. The cost of the pipeline project was $8.5 million and the storage expansion, $2.3 million. The pipe was primed and yardcoated with Reilly coal tar enamel. Glass fabric and Kraft paper were applied as an outerwrap. The field welds were protected with Stuart Super Wrap, manufactured by Stuart Steel Protection Corp. Some details of the right-of-way, the pipeline route, and the construction work are given.

About this research paper

What this paper is about

A 43 mi long, 24 in. dia high-pressure natural gas pipeline was recently built for Oklahoma Natural Gas Co. by KM Engineering Co. and Nelson-Sikes Inc. The line extends through Logan, Kingfisher and Canadian Counties to tie in to the firm's underground storage facility near Edmond. The pipeline will deliver 100-150 million cu ft/day of gas. Two additional 1500 hp compressor units were installed to increase the Edmond underground storage capacity from 10 to 20 billion cu ft/yr. The cost of the pipeline project was $8.5 million and the storage expansion, $2.3 million. The pipe was primed and yardcoated with Reilly coal tar enamel. Glass fabric and Kraft paper were applied as an outerwrap. The field welds were protected with Stuart Super Wrap, manufactured by Stuart Steel Protection Corp. Some details of the right-of-way, the pipeline route, and the construction work are given.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A 43 mi long, 24 in. dia high-pressure natural gas pipeline was recently built for Oklahoma Natural Gas Co. by KM Engineering Co. and Nelson-Sikes Inc. The line extends through Logan, Kingfisher and Canadian Counties to tie in to the firm's underground storage facility near Edmond. The pipeline will deliver 100-150 million cu ft/day of gas. Two additional 1500 hp compressor units were installed to increase the Edmond underground storage capacity from 10 to 20 billion cu ft/yr. The cost of the pipeline project was $8.5 million and the storage expansion, $2.3 million. The pipe was primed and yardcoated with Reilly coal tar enamel. Glass fabric and Kraft paper were applied as an outerwrap. The field welds were protected with Stuart Super Wrap, manufactured by Stuart Steel Protection Corp. Some details of the right-of-way, the pipeline route, and the construction work are given.

Key concepts: Natural gas, Pipeline (software), Petroleum engineering, Natural gas storage, Fuel gas, Engineering, Compressor station, Gas compressor

Related papers

Back to paper searchBrowse research topicsOriginal source
Oklahoma Natural Gas Co. lays new line to gas storage field — Research Paper | ScholarLens