Abstract The mechanical structure of the GREGOR telescope was installed at the Observatorio del Teide, Tenerife, in 2004. New concepts for mounting and cooling of the 1.5‐meter primary mirror were introduced. GREGOR is an open telescope, therefore the dome is completely open during observations to allow for air flushing through the open, but stiff telescope structure. Backside cooling system of the primary mirror keeps the mirror surface close to ambient temperature to prevent mirror seeing. The large collecting area of the primary mirror results in high energy density at the field stop at the prime focus of the primary which needs to be removed. The optical elements are supported by precision alignment systems and should provide a stable solar image at the optical lab. The coudé train can be evacuated and serves as a natural barrier between the outer environmental conditions and the air‐conditioned optical laboratory with its sensitive scientific instrumentation. The telescope was successfully commissioned and will start its nominal operation during 2013 (© 2012 WILEY‐VCH Verlag GmbH & Co. KGaA, Weinheim)

About this research paper

What this paper is about

Abstract The mechanical structure of the GREGOR telescope was installed at the Observatorio del Teide, Tenerife, in 2004. New concepts for mounting and cooling of the 1.5‐meter primary mirror were introduced. GREGOR is an open telescope, therefore the dome is completely open during observations to allow for air flushing through the open, but stiff telescope structure. Backside cooling system of the primary mirror keeps the mirror surface close to ambient temperature to prevent mirror seeing. The large collecting area of the primary mirror results in high energy density at the field stop at the prime focus of the primary which needs to be removed. The optical elements are supported by precision alignment systems and should provide a stable solar image at the optical lab. The coudé train can be evacuated and serves as a natural barrier between the outer environmental conditions and the air‐conditioned optical laboratory with its sensitive scientific instrumentation. The telescope was successfully commissioned and will start its nominal operation during 2013 (© 2012 WILEY‐VCH Verlag GmbH & Co. KGaA, Weinheim)

Why it matters

OpenAlex reports 19 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract The mechanical structure of the GREGOR telescope was installed at the Observatorio del Teide, Tenerife, in 2004. New concepts for mounting and cooling of the 1.5‐meter primary mirror were introduced. GREGOR is an open telescope, therefore the dome is completely open during observations to allow for air flushing through the open, but stiff telescope structure. Backside cooling system of the primary mirror keeps the mirror surface close to ambient temperature to prevent mirror seeing. The large collecting area of the primary mirror results in high energy density at the field stop at the prime focus of the primary which needs to be removed. The optical elements are supported by precision alignment systems and should provide a stable solar image at the optical lab. The coudé train can be evacuated and serves as a natural barrier between the outer environmental conditions and the air‐conditioned optical laboratory with its sensitive scientific instrumentation. The telescope was successfully commissioned and will start its nominal operation during 2013 (© 2012 WILEY‐VCH Verlag GmbH & Co. KGaA, Weinheim)

Key concepts: Telescope, Primary mirror, Active optics, Solar telescope, Physics, Instrumentation (computer programming), Reflecting telescope, Optics