1985•OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

Spent fuel storage requirements

R.A. Libby, B.M. Cole

Open publisher page 1 citations

Abstract

Long before a permanent nuclear waste disposal system is available in the United States, several of the operating commercial nuclear power plants will exhaust their existing spent fuel storage capabilities. Studies to define the magnitude of this interim problem were conducted by the Department of Energy through the Commercial Spent Fuel Management (CSFM) Program at the Pacific Northwest Laboratory. Based on information supplied by the nuclear utilities, these studies indicate that if new storage concepts are not available by 1986 some reactors could encroach on their storage pool's full core reserve (FCR), and ultimately, be forced to shutdown. 3 refs., 2 figs., 5 tabs.

About this research paper

What this paper is about

Long before a permanent nuclear waste disposal system is available in the United States, several of the operating commercial nuclear power plants will exhaust their existing spent fuel storage capabilities. Studies to define the magnitude of this interim problem were conducted by the Department of Energy through the Commercial Spent Fuel Management (CSFM) Program at the Pacific Northwest Laboratory. Based on information supplied by the nuclear utilities, these studies indicate that if new storage concepts are not available by 1986 some reactors could encroach on their storage pool's full core reserve (FCR), and ultimately, be forced to shutdown. 3 refs., 2 figs., 5 tabs.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Long before a permanent nuclear waste disposal system is available in the United States, several of the operating commercial nuclear power plants will exhaust their existing spent fuel storage capabilities. Studies to define the magnitude of this interim problem were conducted by the Department of Energy through the Commercial Spent Fuel Management (CSFM) Program at the Pacific Northwest Laboratory. Based on information supplied by the nuclear utilities, these studies indicate that if new storage concepts are not available by 1986 some reactors could encroach on their storage pool's full core reserve (FCR), and ultimately, be forced to shutdown. 3 refs., 2 figs., 5 tabs.

Key concepts: Spent nuclear fuel, Nuclear power, Waste management, Environmental science, Interim, Spent fuel pool, Radioactive waste, Energy storage

Related papers

Back to paper searchBrowse research topicsOriginal source
Spent fuel storage requirements — Research Paper | ScholarLens