PRIORITY MANAGEMENT FOR URBAN ARTERIALS : TRANSFERABILITY OF TECHNIQUES : YORK/SELBY ROAD
Stephen Clark, A D May, F O Montgomery
Abstract
Open-access reader
Stephen Clark, A D May, F O Montgomery
Abstract
Open-access reader
This paper describes the background and methodology employed in research funded by EPSRC to assess the effect of individual traffic control measures, both in isolation and in combination upon urban arterials. The aim of the project was to test the transferability of the techniques developed in a DRIVE II project, PRIMAVERA, to a range of different types of urban corridor. Measures can be classed into three broad categories: Congestion Management, Public Transport Priority and Traffic Calming. The scope of these measures is wide, some operating at a junction level whilst others affect the whole network. Measures from these areas are applied to a sophisticated microsimulation model of four urban arterial corridors: three in Leeds and one in Leicester. The effects of the application of individual and integrated measures are assessed in terms of their efficiency, environmental and safety impacts using a form of Multi-Criteria Analysis. Travel time and other monetary costs are also taken into consideration. This paper reports the results for the A64 York and A63 Selby Road which are the main arterial routes to the east of Leeds. 1
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper describes the background and methodology employed in research funded by EPSRC to assess the effect of individual traffic control measures, both in isolation and in combination upon urban arterials. The aim of the project was to test the transferability of the techniques developed in a DRIVE II project, PRIMAVERA, to a range of different types of urban corridor. Measures can be classed into three broad categories: Congestion Management, Public Transport Priority and Traffic Calming. The scope of these measures is wide, some operating at a junction level whilst others affect the whole network. Measures from these areas are applied to a sophisticated microsimulation model of four urban arterial corridors: three in Leeds and one in Leicester. The effects of the application of individual and integrated measures are assessed in terms of their efficiency, environmental and safety impacts using a form of Multi-Criteria Analysis. Travel time and other monetary costs are also taken into consideration. This paper reports the results for the A64 York and A63 Selby Road which are the main arterial routes to the east of Leeds. 1
Key concepts: Transferability, Scope (computer science), Transport engineering, Traffic congestion, Public transport, Microsimulation, Business, Computer science