An analysis of weapon system readiness for operational testing
James B. Mills
Abstract
James B. Mills
Abstract
The purpose of this thesis is to analyze Army weapon system Operational Tests & Evaluations (OT&E) that have been conducted at Fort Hunter- Liggett, California. Four weapon systems were reviewed and analyzed including: the ADATS (LOS-F-H) air defense system, Avenger (Pedestal Mounted Stinger) air defense system, OH-58D (AHIP) scout helicopter and the Apache (AH-64) attack helicopter. The most common issues that Program Managers encountered in preparing their systems for operational testing were identified. A comparative analysis provides a summary of these problems and the reasons they occurred along with proposed solutions, enhancement observations, and 'lessons learned' that should be useful to Program Managers. This thesis concludes that Program Managers need to place greater emphasis on preparation for operational testing with attention on the areas of test schedules, technical manuals, resources, and user training. Acquisition lessons learned, Test and evaluation,
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The purpose of this thesis is to analyze Army weapon system Operational Tests & Evaluations (OT&E) that have been conducted at Fort Hunter- Liggett, California. Four weapon systems were reviewed and analyzed including: the ADATS (LOS-F-H) air defense system, Avenger (Pedestal Mounted Stinger) air defense system, OH-58D (AHIP) scout helicopter and the Apache (AH-64) attack helicopter. The most common issues that Program Managers encountered in preparing their systems for operational testing were identified. A comparative analysis provides a summary of these problems and the reasons they occurred along with proposed solutions, enhancement observations, and 'lessons learned' that should be useful to Program Managers. This thesis concludes that Program Managers need to place greater emphasis on preparation for operational testing with attention on the areas of test schedules, technical manuals, resources, and user training. Acquisition lessons learned, Test and evaluation,
Key concepts: Aeronautics, Weapon system, Test (biology), Operations research, Engineering, Engineering management, Computer science, Operations management