A Study of Task Loading Using a Three Man Crew on a KC-135 Aircraft.
Richard Geiselhart, Richard J. Schiffler, Ivey,Larry J
Abstract
Richard Geiselhart, Richard J. Schiffler, Ivey,Larry J
Abstract
A series of flight tests were conducted to assess the feasibility of reducing crew size on KC-135 from 4 to 3. A dual INS was installed in the test aircraft, and refueling missions flown task times of crew performing duties were recorded. Subjects also completed questionnaires. It was concluded that on several types of missions a three man crew leads to extremely high workloads. (Author)
OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A series of flight tests were conducted to assess the feasibility of reducing crew size on KC-135 from 4 to 3. A dual INS was installed in the test aircraft, and refueling missions flown task times of crew performing duties were recorded. Subjects also completed questionnaires. It was concluded that on several types of missions a three man crew leads to extremely high workloads. (Author)
Key concepts: Crew, Aeronautics, Task (project management), Test (biology), Engineering, Computer science, Simulation, Systems engineering