The downstream migrant fish problems associated with hydroelectric facilities on the Exploits River, Newfoundland

M K Farwell

Open publisher page 0 citations

Abstract

One of the greatest concerns about developing an anadromous run of Atlantic salmon within the Exploits River watershed is the presence of hydroelectric facilities on the river. The danger of excessive mortalities to emigrating fish must be investigated before implementing any development schemes for the areas above the hydroelectric facilities. The Grand Falls and Bishop Falls power developments are on the main Exploits River. All salmon runs now present and those to be developed must pass the Bishop Falls site. At present, only the Noel Paul's Spawning Channel produced fish pass the Grand Falls site. This report was undertaken to assemble information on these structures and recommend measures which should be taken before further salmon development is implemented. Meadus estimated a cost of $1.25 million for fish diversion structures at these three sites. This report investigates the necessity of this large expenditure.

About this research paper

What this paper is about

One of the greatest concerns about developing an anadromous run of Atlantic salmon within the Exploits River watershed is the presence of hydroelectric facilities on the river. The danger of excessive mortalities to emigrating fish must be investigated before implementing any development schemes for the areas above the hydroelectric facilities. The Grand Falls and Bishop Falls power developments are on the main Exploits River. All salmon runs now present and those to be developed must pass the Bishop Falls site. At present, only the Noel Paul's Spawning Channel produced fish pass the Grand Falls site. This report was undertaken to assemble information on these structures and recommend measures which should be taken before further salmon development is implemented. Meadus estimated a cost of $1.25 million for fish diversion structures at these three sites. This report investigates the necessity of this large expenditure.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

One of the greatest concerns about developing an anadromous run of Atlantic salmon within the Exploits River watershed is the presence of hydroelectric facilities on the river. The danger of excessive mortalities to emigrating fish must be investigated before implementing any development schemes for the areas above the hydroelectric facilities. The Grand Falls and Bishop Falls power developments are on the main Exploits River. All salmon runs now present and those to be developed must pass the Bishop Falls site. At present, only the Noel Paul's Spawning Channel produced fish pass the Grand Falls site. This report was undertaken to assemble information on these structures and recommend measures which should be taken before further salmon development is implemented. Meadus estimated a cost of $1.25 million for fish diversion structures at these three sites. This report investigates the necessity of this large expenditure.

Key concepts: Hydroelectricity, Downstream (manufacturing), Fishery, Exploit, Fish <Actinopterygii>, Fish migration, Geography, Environmental science