1981Defense Technical Information Center (DTIC)Requires access

Evaluation of Standard Integrated Support Management System (SISMS).

Hunter W Tyler, Richard Martinko

Open publisher page 0 citations

Abstract

THE CG, DARCOM requested that the Logistics Studies Office, Army Logistics Management Center (LSO, ALMC) conduct an independent evaluation of SISMS to determine its value, need and compatibility with related DARCOM procedures. The study was accomplished through the use of a comprehensive questionnaire consisting of thirty-five questions relating to SISMS. The questionnaire was directed to those activities within DARCOM with specific responsibilities for SISMS in current regulations. In addition to the questionnaire, personal visits were made to US Army Tank Automotive Command (TACOM), US Army Aviation Research and Development Command (AVRADCOM) and US Army Troop Support and Aviation Materiel Readiness Command (TSARCOM). Project/Product managers within these commands were also contacted in connection with these visits. Evaluation of the questionnaire and personal visits coupled with a review of current regulations and studies completed on SISMS resulted in reaching the conclusion that the SISMS regulation currently in use should be eliminated upon establishment of a Joint Logistics Coordinating Panel with the responsibility to develop and implement a procedure for the standardized appliation of MIL STDS 1388-1/2 and 1552/1561 service wide. (Author)

About this research paper

What this paper is about

THE CG, DARCOM requested that the Logistics Studies Office, Army Logistics Management Center (LSO, ALMC) conduct an independent evaluation of SISMS to determine its value, need and compatibility with related DARCOM procedures. The study was accomplished through the use of a comprehensive questionnaire consisting of thirty-five questions relating to SISMS. The questionnaire was directed to those activities within DARCOM with specific responsibilities for SISMS in current regulations. In addition to the questionnaire, personal visits were made to US Army Tank Automotive Command (TACOM), US Army Aviation Research and Development Command (AVRADCOM) and US Army Troop Support and Aviation Materiel Readiness Command (TSARCOM). Project/Product managers within these commands were also contacted in connection with these visits. Evaluation of the questionnaire and personal visits coupled with a review of current regulations and studies completed on SISMS resulted in reaching the conclusion that the SISMS regulation currently in use should be eliminated upon establishment of a Joint Logistics Coordinating Panel with the responsibility to develop and implement a procedure for the standardized appliation of MIL STDS 1388-1/2 and 1552/1561 service wide. (Author)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THE CG, DARCOM requested that the Logistics Studies Office, Army Logistics Management Center (LSO, ALMC) conduct an independent evaluation of SISMS to determine its value, need and compatibility with related DARCOM procedures. The study was accomplished through the use of a comprehensive questionnaire consisting of thirty-five questions relating to SISMS. The questionnaire was directed to those activities within DARCOM with specific responsibilities for SISMS in current regulations. In addition to the questionnaire, personal visits were made to US Army Tank Automotive Command (TACOM), US Army Aviation Research and Development Command (AVRADCOM) and US Army Troop Support and Aviation Materiel Readiness Command (TSARCOM). Project/Product managers within these commands were also contacted in connection with these visits. Evaluation of the questionnaire and personal visits coupled with a review of current regulations and studies completed on SISMS resulted in reaching the conclusion that the SISMS regulation currently in use should be eliminated upon establishment of a Joint Logistics Coordinating Panel with the responsibility to develop and implement a procedure for the standardized appliation of MIL STDS 1388-1/2 and 1552/1561 service wide. (Author)

Key concepts: Aviation, Operations management, Engineering management, Automotive industry, Engineering, Product (mathematics), Service (business), Aeronautics

Related papers

Back to paper searchBrowse research topicsOriginal source
Evaluation of Standard Integrated Support Management System (SISMS). — Research Paper | ScholarLens