Semiautomatic gas metal arc welding of carbon steel. Welding procedure specification
C.H. Wodtke, D.R. Frizzell, W.A. Plunkett
Abstract
C.H. Wodtke, D.R. Frizzell, W.A. Plunkett
Abstract
Procedure WPS-109-ASME-2 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for semiautomatic gas metal arc welding of carbon steel (P-1-1), in thickness range 0.187 to 2.0 inch; filler metal is ER70S-3 (F-6, A-1); shielding gas is 95-5 argon-oxygen.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Procedure WPS-109-ASME-2 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for semiautomatic gas metal arc welding of carbon steel (P-1-1), in thickness range 0.187 to 2.0 inch; filler metal is ER70S-3 (F-6, A-1); shielding gas is 95-5 argon-oxygen.
Key concepts: Welding, Shielding gas, Filler metal, Metallurgy, Gas tungsten arc welding, Arc welding, Boiler (water heating), Gas metal arc welding