1991Defense Technical Information Center (DTIC)Requires access

An Analysis of the Support Equipment Acquisition Process and Methods Designed to Reduce Acquisition Leadtime

Williams, Bradie

Open publisher page 0 citations

Abstract

Support equipment acquisition leadtime continues to be a problem for both the United States Air Force and our foreign military sales programs. As a microcosm of the entire Department of Defense acquisition process, support equipment is often, late to need, without a complete integrated logistics support package, of poor or unstable design, and frequently requires considerable interim support. The purpose of this thesis is to look at the support equipment acquisition process from three perspectives: (1) from the overall weapon system acquisition process; (2) in the broad perspective of the integrated logistics support (ILS) concept; and (3) in the much narrower perspective of procuring organizations. The objective of this thesis is to examine support equipment acquisition from the viewpoint of the procuring organizations.

About this research paper

What this paper is about

Support equipment acquisition leadtime continues to be a problem for both the United States Air Force and our foreign military sales programs. As a microcosm of the entire Department of Defense acquisition process, support equipment is often, late to need, without a complete integrated logistics support package, of poor or unstable design, and frequently requires considerable interim support. The purpose of this thesis is to look at the support equipment acquisition process from three perspectives: (1) from the overall weapon system acquisition process; (2) in the broad perspective of the integrated logistics support (ILS) concept; and (3) in the much narrower perspective of procuring organizations. The objective of this thesis is to examine support equipment acquisition from the viewpoint of the procuring organizations.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Support equipment acquisition leadtime continues to be a problem for both the United States Air Force and our foreign military sales programs. As a microcosm of the entire Department of Defense acquisition process, support equipment is often, late to need, without a complete integrated logistics support package, of poor or unstable design, and frequently requires considerable interim support. The purpose of this thesis is to look at the support equipment acquisition process from three perspectives: (1) from the overall weapon system acquisition process; (2) in the broad perspective of the integrated logistics support (ILS) concept; and (3) in the much narrower perspective of procuring organizations. The objective of this thesis is to examine support equipment acquisition from the viewpoint of the procuring organizations.

Key concepts: Process (computing), Interim, Engineering, Perspective (graphical), Process management, Business, Operations management, Operations research

Related papers

Back to paper searchBrowse research topicsOriginal source
An Analysis of the Support Equipment Acquisition Process and Methods Designed to Reduce Acquisition Leadtime — Research Paper | ScholarLens