PICNIC AT HANGING LAKE

J P Tiernan

Open publisher page 0 citations

Abstract

This article describes the construction of the Hanging Lake Tunnel in Glenwood Canyon, CO, USA, which has completed the Interstate 70 highway which runs east-west across the USA. The whole four-lane highway and the tunnel are now fully used ahead of schedule. The 4000ft long tunnel not only relieves congestion on the highway, but enables the old road to be used solely for visitors' enjoyment of a scenically attractive recreation area. Both ends of the tunnel are approached above ground level. The east portal is approached via the Hanging Lake Viaduct. This is a 7000ft concrete segmented bridge. The west portal is approached over a 1200ft steel girder bridge. The tunnel set various records: (1) it was completed a year ahead of schedule; (2) it used new tunnelling equipment and support systems; (3) its ceiling cladding was done faster than usual; and (4) its cost was almost $15 million less than the estimated cost. Innovations in the equipment for the tunnel's drill and blast procedure included: (1) the Rocket Boomer, a prototype drill rig from Atlas Copco; (2) the structural support, where shotcreting and rock bolts were used instead of steel ribs; and (3) the use of a robotic arm for shotcreting. The tunnel uses automated lighting, to accommodate outside light levels, and a wide variety of high- technology monitors and sensors. Their operations are controlled continually from an underground complex.

About this research paper

What this paper is about

This article describes the construction of the Hanging Lake Tunnel in Glenwood Canyon, CO, USA, which has completed the Interstate 70 highway which runs east-west across the USA. The whole four-lane highway and the tunnel are now fully used ahead of schedule. The 4000ft long tunnel not only relieves congestion on the highway, but enables the old road to be used solely for visitors' enjoyment of a scenically attractive recreation area. Both ends of the tunnel are approached above ground level. The east portal is approached via the Hanging Lake Viaduct. This is a 7000ft concrete segmented bridge. The west portal is approached over a 1200ft steel girder bridge. The tunnel set various records: (1) it was completed a year ahead of schedule; (2) it used new tunnelling equipment and support systems; (3) its ceiling cladding was done faster than usual; and (4) its cost was almost $15 million less than the estimated cost. Innovations in the equipment for the tunnel's drill and blast procedure included: (1) the Rocket Boomer, a prototype drill rig from Atlas Copco; (2) the structural support, where shotcreting and rock bolts were used instead of steel ribs; and (3) the use of a robotic arm for shotcreting. The tunnel uses automated lighting, to accommodate outside light levels, and a wide variety of high- technology monitors and sensors. Their operations are controlled continually from an underground complex.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This article describes the construction of the Hanging Lake Tunnel in Glenwood Canyon, CO, USA, which has completed the Interstate 70 highway which runs east-west across the USA. The whole four-lane highway and the tunnel are now fully used ahead of schedule. The 4000ft long tunnel not only relieves congestion on the highway, but enables the old road to be used solely for visitors' enjoyment of a scenically attractive recreation area. Both ends of the tunnel are approached above ground level. The east portal is approached via the Hanging Lake Viaduct. This is a 7000ft concrete segmented bridge. The west portal is approached over a 1200ft steel girder bridge. The tunnel set various records: (1) it was completed a year ahead of schedule; (2) it used new tunnelling equipment and support systems; (3) its ceiling cladding was done faster than usual; and (4) its cost was almost $15 million less than the estimated cost. Innovations in the equipment for the tunnel's drill and blast procedure included: (1) the Rocket Boomer, a prototype drill rig from Atlas Copco; (2) the structural support, where shotcreting and rock bolts were used instead of steel ribs; and (3) the use of a robotic arm for shotcreting. The tunnel uses automated lighting, to accommodate outside light levels, and a wide variety of high- technology monitors and sensors. Their operations are controlled continually from an underground complex.

Key concepts: Engineering, Drill, Schedule, Canyon, Civil engineering, Geology, Computer science, Operating system