Economic recovery of marginal offshore gas
Richard S. Hollyer, David W. Fowler
Abstract
Richard S. Hollyer, David W. Fowler
Abstract
Transportation of 10.7 million cu ft/day of natural gas compressed to 2400 psi by barge from a reservoir 15 mi from the nearest offloading point would require total operating costs of $1.191/1000 cu ft, as compared with $2.749/1000 cu ft by pipeline, assuming 8 billion cu ft of reserves. Two or three barges moved by tugs at 9 knots max would contain 12 vessels holding 300,000 cu ft each of gas and be able to operate in waves up to 8 ft high. It is entirely feasible that barge transportation of natural gas will be implemented in the Gulf of Mexico within two years. A urea plant using 43 million cu ft/day of natural gas to produce 1755 tons/day of urea about 100 mi offshore of a developing nation would require a $149 million capital investment, fixed operating costs of $30 million/yr, and total variable operating costs of $40,000/day, assuming a water depth of 180 ft, a wave height of 52 ft max, a wind speed of 100 knots max, and a 2.5% product loss. The best design would involve a jackup platform and passing a 75% solution at 240/sup 0/F to a barge for finishing into solid products.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Transportation of 10.7 million cu ft/day of natural gas compressed to 2400 psi by barge from a reservoir 15 mi from the nearest offloading point would require total operating costs of $1.191/1000 cu ft, as compared with $2.749/1000 cu ft by pipeline, assuming 8 billion cu ft of reserves. Two or three barges moved by tugs at 9 knots max would contain 12 vessels holding 300,000 cu ft each of gas and be able to operate in waves up to 8 ft high. It is entirely feasible that barge transportation of natural gas will be implemented in the Gulf of Mexico within two years. A urea plant using 43 million cu ft/day of natural gas to produce 1755 tons/day of urea about 100 mi offshore of a developing nation would require a $149 million capital investment, fixed operating costs of $30 million/yr, and total variable operating costs of $40,000/day, assuming a water depth of 180 ft, a wave height of 52 ft max, a wind speed of 100 knots max, and a 2.5% product loss. The best design would involve a jackup platform and passing a 75% solution at 240/sup 0/F to a barge for finishing into solid products.
Key concepts: BARGE, Natural gas, Submarine pipeline, Pipeline transport, Environmental science, Offshore oil and gas, Capital cost, Waste management