A Study on the Stability of Embankment Due to the Construction of Embankment Combined Use Road
Sung-Nam Kim, Young‐Woo Lee
Abstract
Sung-Nam Kim, Young‐Woo Lee
Abstract
This study analyzes the change of stability of embankment due to the construction of embankment combined used road with two different construction phases. The stabilities have been checked both in the phase of earth banking for a road construction and in the phase of the application of the traffic roads(DB-24). In both cases the factor of safety has been found higher than 1.3 which is the general criterion of the safety of an embankment. The results indicate that the safety of an embankment due to the construction of embankment combined use road is assured, and thus, it is thought that the construction of embankment combined use road can be considered for cutting down on expenses of construction sites for a road construction. However, the pre-examination of stability due to the construction should be carried out because it decreases the factor of safety of an embankment. From this study, it has been found that the factor of safety was dropped most when the water level rose in the transient flow. The result indicates that the stability analysis of a river embankment where the water level changes frequently should be carried out in the condition of transient flow. It is recommended that the inner side of an embankment should have a slope of 1:2 which is identical with the slope of the existing embankment. In addition, the factor of safety also can be decreased due to the traffic loads, and therefore, the effect should also be considered after the construction of embankment combined used road limiting the traffic loads.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This study analyzes the change of stability of embankment due to the construction of embankment combined used road with two different construction phases. The stabilities have been checked both in the phase of earth banking for a road construction and in the phase of the application of the traffic roads(DB-24). In both cases the factor of safety has been found higher than 1.3 which is the general criterion of the safety of an embankment. The results indicate that the safety of an embankment due to the construction of embankment combined use road is assured, and thus, it is thought that the construction of embankment combined use road can be considered for cutting down on expenses of construction sites for a road construction. However, the pre-examination of stability due to the construction should be carried out because it decreases the factor of safety of an embankment. From this study, it has been found that the factor of safety was dropped most when the water level rose in the transient flow. The result indicates that the stability analysis of a river embankment where the water level changes frequently should be carried out in the condition of transient flow. It is recommended that the inner side of an embankment should have a slope of 1:2 which is identical with the slope of the existing embankment. In addition, the factor of safety also can be decreased due to the traffic loads, and therefore, the effect should also be considered after the construction of embankment combined used road limiting the traffic loads.
Key concepts: Levee, Geotechnical engineering, Safety factor, Transient flow, Engineering, Factor of safety, Geology, Civil engineering