Winter at Oslo Airport

Erik Gill

Open publisher page 0 citations

Abstract

At Oslo Airport Gardermoen, Norway's main airport, winter is defined as the period between October 15th and April 15th. Since Oslo Airport Gardermoen is located inland, climate conditions can vary from mild to rainy to freezing fog. These variations in climatological conditions present challenges to maintaining clear runways, especially considering the fact that the airport is built over a large reservoir of ground water, requiring limited use of snow removing chemicals in order to avoid pollution. The article discusses in detail how winter maintenance is conducted, from both a manpower utilization and communications standpoint. There is also a detailed discussion of de-icing and snow removal methods (where sand is used as an alternative though albeit more costly method which must be shared between Oslo Airport's airline partners). An inventory list of equipment used in snow removal – from sweepers and snow blowers to chemical spreaders and friction testing vehicles – is also included.

About this research paper

What this paper is about

At Oslo Airport Gardermoen, Norway's main airport, winter is defined as the period between October 15th and April 15th. Since Oslo Airport Gardermoen is located inland, climate conditions can vary from mild to rainy to freezing fog. These variations in climatological conditions present challenges to maintaining clear runways, especially considering the fact that the airport is built over a large reservoir of ground water, requiring limited use of snow removing chemicals in order to avoid pollution. The article discusses in detail how winter maintenance is conducted, from both a manpower utilization and communications standpoint. There is also a detailed discussion of de-icing and snow removal methods (where sand is used as an alternative though albeit more costly method which must be shared between Oslo Airport's airline partners). An inventory list of equipment used in snow removal – from sweepers and snow blowers to chemical spreaders and friction testing vehicles – is also included.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

At Oslo Airport Gardermoen, Norway's main airport, winter is defined as the period between October 15th and April 15th. Since Oslo Airport Gardermoen is located inland, climate conditions can vary from mild to rainy to freezing fog. These variations in climatological conditions present challenges to maintaining clear runways, especially considering the fact that the airport is built over a large reservoir of ground water, requiring limited use of snow removing chemicals in order to avoid pollution. The article discusses in detail how winter maintenance is conducted, from both a manpower utilization and communications standpoint. There is also a detailed discussion of de-icing and snow removal methods (where sand is used as an alternative though albeit more costly method which must be shared between Oslo Airport's airline partners). An inventory list of equipment used in snow removal – from sweepers and snow blowers to chemical spreaders and friction testing vehicles – is also included.

Key concepts: Runway, Snow, Environmental science, Snow removal, International airport, Meteorology, Icing, Transport engineering