1999ACI Concrete InternationalRequires access

POSTMORTEM OF A FAILED BRIDGE

Bernard S. Covino, Stephen D. Cramer, Gordon R. Holcomb, Sophie J. Bullard, H M Laylor

Open publisher page 7 citations

Abstract

Much of the research that is responsible for extending the service life of new and existing bridges is less than 10 years old. Reinforced concrete bridges built 40 to 70 years ago were not built with any of the technological advantages for combatting corrosion damage as are now used in modern bridges. Maintenance and repair efforts reflected the construction practices of that earlier period. Today many of these older bridges are still in service along the Oregon coast and in sound condition. The purpose of this article is to examine the reasons it was necessary to replace one bridge, the Rocky Point Viaduct, after a service life shorter than that of other bridges built during the same time period. The maintenance and repair history of this bridge is documented in this article. A postmortem analysis of one beam from the bridge is presented.

About this research paper

What this paper is about

Much of the research that is responsible for extending the service life of new and existing bridges is less than 10 years old. Reinforced concrete bridges built 40 to 70 years ago were not built with any of the technological advantages for combatting corrosion damage as are now used in modern bridges. Maintenance and repair efforts reflected the construction practices of that earlier period. Today many of these older bridges are still in service along the Oregon coast and in sound condition. The purpose of this article is to examine the reasons it was necessary to replace one bridge, the Rocky Point Viaduct, after a service life shorter than that of other bridges built during the same time period. The maintenance and repair history of this bridge is documented in this article. A postmortem analysis of one beam from the bridge is presented.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Much of the research that is responsible for extending the service life of new and existing bridges is less than 10 years old. Reinforced concrete bridges built 40 to 70 years ago were not built with any of the technological advantages for combatting corrosion damage as are now used in modern bridges. Maintenance and repair efforts reflected the construction practices of that earlier period. Today many of these older bridges are still in service along the Oregon coast and in sound condition. The purpose of this article is to examine the reasons it was necessary to replace one bridge, the Rocky Point Viaduct, after a service life shorter than that of other bridges built during the same time period. The maintenance and repair history of this bridge is documented in this article. A postmortem analysis of one beam from the bridge is presented.

Key concepts: Bridge (graph theory), Forensic engineering, Engineering, Reinforced concrete, Service life, Service (business), Civil engineering, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
POSTMORTEM OF A FAILED BRIDGE — Research Paper | ScholarLens