1983Oil & gas journal/Oil and gas journalRequires access

Designing and laying the FLAGS offshore line

D.E. Broussard, K.P. Mavik

Open publisher page 0 citations

Abstract

Brent field is the largest oil and gas reservoir in the British sector of the North Sea. Above the oil there is a significant gas cap with associate natural-gas liquids. The development of the field is a joint venture of Shell U.K. Ltd. and Esso Petroleum Co. Ltd., with Shell Expro acting as operator. The Brent gas and associated gas liquids are transported to the mainland at St. Fergus, Scotland, through a 450-km-long, 36-in.-diameter subsea pipeline, which is the offshore part of the FLAGS (Far North Liquid and Associated Gas System) Project. At St. Fergus the FLAGS gas-processing plant extracts the natural-gas liquids and delivers dry methane into the British Gas Corp. crosscountry transport pipeline. The liquids will be transported overland via a 222-km, 20-in.-diameter pipeline, to a NGL fractionation plant now under construction at Mossmoran. The liquids will be separated into ethane, propane, butane, and natural gasoline. Transport of these products will be through a tanker-loading facility near Mossmoran at Braefoot Bay on the Firth of Forth. The system is designed for an initial capacity to handle about 1,000 MMscfd of methane gas, plus about 100,000 b/d of associated liquids. This two-part article reviews the construction and commissioning ofmore » the offshore gas pipeline project, with emphasis on the planning and special engineering efforts which resulted in cost savings of about pounds138 million.« less

About this research paper

What this paper is about

Brent field is the largest oil and gas reservoir in the British sector of the North Sea. Above the oil there is a significant gas cap with associate natural-gas liquids. The development of the field is a joint venture of Shell U.K. Ltd. and Esso Petroleum Co. Ltd., with Shell Expro acting as operator. The Brent gas and associated gas liquids are transported to the mainland at St. Fergus, Scotland, through a 450-km-long, 36-in.-diameter subsea pipeline, which is the offshore part of the FLAGS (Far North Liquid and Associated Gas System) Project. At St. Fergus the FLAGS gas-processing plant extracts the natural-gas liquids and delivers dry methane into the British Gas Corp. crosscountry transport pipeline. The liquids will be transported overland via a 222-km, 20-in.-diameter pipeline, to a NGL fractionation plant now under construction at Mossmoran. The liquids will be separated into ethane, propane, butane, and natural gasoline. Transport of these products will be through a tanker-loading facility near Mossmoran at Braefoot Bay on the Firth of Forth. The system is designed for an initial capacity to handle about 1,000 MMscfd of methane gas, plus about 100,000 b/d of associated liquids. This two-part article reviews the construction and commissioning ofmore » the offshore gas pipeline project, with emphasis on the planning and special engineering efforts which resulted in cost savings of about pounds138 million.« less

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Brent field is the largest oil and gas reservoir in the British sector of the North Sea. Above the oil there is a significant gas cap with associate natural-gas liquids. The development of the field is a joint venture of Shell U.K. Ltd. and Esso Petroleum Co. Ltd., with Shell Expro acting as operator. The Brent gas and associated gas liquids are transported to the mainland at St. Fergus, Scotland, through a 450-km-long, 36-in.-diameter subsea pipeline, which is the offshore part of the FLAGS (Far North Liquid and Associated Gas System) Project. At St. Fergus the FLAGS gas-processing plant extracts the natural-gas liquids and delivers dry methane into the British Gas Corp. crosscountry transport pipeline. The liquids will be transported overland via a 222-km, 20-in.-diameter pipeline, to a NGL fractionation plant now under construction at Mossmoran. The liquids will be separated into ethane, propane, butane, and natural gasoline. Transport of these products will be through a tanker-loading facility near Mossmoran at Braefoot Bay on the Firth of Forth. The system is designed for an initial capacity to handle about 1,000 MMscfd of methane gas, plus about 100,000 b/d of associated liquids. This two-part article reviews the construction and commissioning ofmore » the offshore gas pipeline project, with emphasis on the planning and special engineering efforts which resulted in cost savings of about pounds138 million.« less

Key concepts: Natural gas, Submarine pipeline, Natural gas field, Petroleum, Fuel gas, Liquefied natural gas, Associated petroleum gas, Pipeline transport

Related papers

Back to paper searchBrowse research topicsOriginal source
Designing and laying the FLAGS offshore line — Research Paper | ScholarLens