2013Earthquake Engineering & Structural DynamicsRequires access

Practice‐oriented estimation of the seismic demand hazard using ground motions at few intensity levels

Brendon Bradley

Open publisher page 42 citations

Abstract

SUMMARY This paper examines the calculation of the seismic demand hazard in a practice‐oriented manner via the use of seismic response analyses at few intensity levels. The seismic demand hazard is a more robust measure for quantifying seismic performance, when seismic hazard is represented in a probabilistic format, than intensity‐based assessments, which remain prevalent in seismic design codes. It is illustrated that, for a relatively complex bridge–foundation–soil system case study, the seismic demand hazard can be estimated with sufficient accuracy using as little as three intensity measure levels that have exceedance probabilities of 50%, 10% and 2% in 50 years which are already of interest in multi‐objective performance‐based design. Compared with the conventional use of the mean demand from an intensity‐based assessment(s), it is illustrated that, for the same number of seismic response analyses, a practice‐oriented ‘approximate’ seismic demand hazard is a more accurate and precise estimate of the ‘exact’ seismic demand hazard. Direct estimation of the seismic demand hazard also provides information of seismic performance at multiple exceedance rates. Thus, it is advocated that if seismic hazard is considered in a probabilistic format, then seismic performance assessment, and acceptance criteria, should be in terms of the seismic demand hazard and not intensity‐based assessments. Copyright © 2013 John Wiley & Sons, Ltd.

About this research paper

What this paper is about

SUMMARY This paper examines the calculation of the seismic demand hazard in a practice‐oriented manner via the use of seismic response analyses at few intensity levels. The seismic demand hazard is a more robust measure for quantifying seismic performance, when seismic hazard is represented in a probabilistic format, than intensity‐based assessments, which remain prevalent in seismic design codes. It is illustrated that, for a relatively complex bridge–foundation–soil system case study, the seismic demand hazard can be estimated with sufficient accuracy using as little as three intensity measure levels that have exceedance probabilities of 50%, 10% and 2% in 50 years which are already of interest in multi‐objective performance‐based design. Compared with the conventional use of the mean demand from an intensity‐based assessment(s), it is illustrated that, for the same number of seismic response analyses, a practice‐oriented ‘approximate’ seismic demand hazard is a more accurate and precise estimate of the ‘exact’ seismic demand hazard. Direct estimation of the seismic demand hazard also provides information of seismic performance at multiple exceedance rates. Thus, it is advocated that if seismic hazard is considered in a probabilistic format, then seismic performance assessment, and acceptance criteria, should be in terms of the seismic demand hazard and not intensity‐based assessments. Copyright © 2013 John Wiley & Sons, Ltd.

Why it matters

OpenAlex reports 42 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

SUMMARY This paper examines the calculation of the seismic demand hazard in a practice‐oriented manner via the use of seismic response analyses at few intensity levels. The seismic demand hazard is a more robust measure for quantifying seismic performance, when seismic hazard is represented in a probabilistic format, than intensity‐based assessments, which remain prevalent in seismic design codes. It is illustrated that, for a relatively complex bridge–foundation–soil system case study, the seismic demand hazard can be estimated with sufficient accuracy using as little as three intensity measure levels that have exceedance probabilities of 50%, 10% and 2% in 50 years which are already of interest in multi‐objective performance‐based design. Compared with the conventional use of the mean demand from an intensity‐based assessment(s), it is illustrated that, for the same number of seismic response analyses, a practice‐oriented ‘approximate’ seismic demand hazard is a more accurate and precise estimate of the ‘exact’ seismic demand hazard. Direct estimation of the seismic demand hazard also provides information of seismic performance at multiple exceedance rates. Thus, it is advocated that if seismic hazard is considered in a probabilistic format, then seismic performance assessment, and acceptance criteria, should be in terms of the seismic demand hazard and not intensity‐based assessments. Copyright © 2013 John Wiley & Sons, Ltd.

Key concepts: Seismic hazard, Environmental Seismic Intensity scale, Earthquake scenario, Incremental Dynamic Analysis, Hazard, Intensity (physics), Seismic risk, Probabilistic logic

Related papers

Back to paper searchBrowse research topicsOriginal source
Practice‐oriented estimation of the seismic demand hazard using ground motions at few intensity levels — Research Paper | ScholarLens