1982OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)Requires access

Experiment data report for LOFT anticipated transient-without-scram Experiment L9-3. [PWR]

D.L. Batt, J.M. Divine, Kerry McKenna

Open publisher page 2 citations

Abstract

Selected pertinent and uninterpreted data from the third anticipated transient with multiple failures experiment (Experiment L9-3) conducted in the Loss-of-Fluid Test (LOFT) facility are presented. The LOFT facility is a 50-MW(t) pressurized water reactor (PWR) system with instruments that measure and provide data on the system thermal-hydraulic and nuclear conditions. The operation of the LOFT system is typical of large (approx. 1000 MW(e)), commercial PWR operations. Experiment L9-3 simulated a loss-of-feedwater anticipated transient without scram. The loss-of-feedwater accident led to an increase in the primary coolant system temperature and pressure. Both the experiment power-operated relief valve (PORV) and safety relief valve opened and were able to limit and control the pressure transient. The plant was then recovered with the control rods still withdrawn by injecting 7200-ppM borated water, manually cycling the PORV and feeding and bleeding the steam generator.

About this research paper

What this paper is about

Selected pertinent and uninterpreted data from the third anticipated transient with multiple failures experiment (Experiment L9-3) conducted in the Loss-of-Fluid Test (LOFT) facility are presented. The LOFT facility is a 50-MW(t) pressurized water reactor (PWR) system with instruments that measure and provide data on the system thermal-hydraulic and nuclear conditions. The operation of the LOFT system is typical of large (approx. 1000 MW(e)), commercial PWR operations. Experiment L9-3 simulated a loss-of-feedwater anticipated transient without scram. The loss-of-feedwater accident led to an increase in the primary coolant system temperature and pressure. Both the experiment power-operated relief valve (PORV) and safety relief valve opened and were able to limit and control the pressure transient. The plant was then recovered with the control rods still withdrawn by injecting 7200-ppM borated water, manually cycling the PORV and feeding and bleeding the steam generator.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Selected pertinent and uninterpreted data from the third anticipated transient with multiple failures experiment (Experiment L9-3) conducted in the Loss-of-Fluid Test (LOFT) facility are presented. The LOFT facility is a 50-MW(t) pressurized water reactor (PWR) system with instruments that measure and provide data on the system thermal-hydraulic and nuclear conditions. The operation of the LOFT system is typical of large (approx. 1000 MW(e)), commercial PWR operations. Experiment L9-3 simulated a loss-of-feedwater anticipated transient without scram. The loss-of-feedwater accident led to an increase in the primary coolant system temperature and pressure. Both the experiment power-operated relief valve (PORV) and safety relief valve opened and were able to limit and control the pressure transient. The plant was then recovered with the control rods still withdrawn by injecting 7200-ppM borated water, manually cycling the PORV and feeding and bleeding the steam generator.

Key concepts: Scram, Boiler feedwater, Relief valve, Nuclear engineering, Shutdown, Safety valve, Transient (computer programming), Pressurized water reactor