Overview of the National Transuranic Waste System.
David C. Moody, Stephanie Jennings, Lionel Smith, I.R. Triay, G. Basabilvazo
Abstract
Open-access reader
David C. Moody, Stephanie Jennings, Lionel Smith, I.R. Triay, G. Basabilvazo
Abstract
Open-access reader
The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) became a reality with the first receipt of waste in March 1999. The years of planning, certification, and permitting milestones were met and the facility began its' mission of safe disposal of the nations transuranic (TRU) waste. Today, more than 12,000 drum equivalents of TRU waste, are resting safely in bedded salt 2,150 feet (nearly one-half mile) beneath the surface of the New Mexico desert-a rock formation that has not moved since it fonned some 250 million years ago. It took more than 20 years to build, license and open the WIPP as the nation's first deep geologic repository for the permanent disposal of defense-generated TRU waste now stored above ground at 23 sites across the country. As it was throughout those 20 years, safety is the number one priority and most significant achievement as the project moves into its third year of disposal operations.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) became a reality with the first receipt of waste in March 1999. The years of planning, certification, and permitting milestones were met and the facility began its' mission of safe disposal of the nations transuranic (TRU) waste. Today, more than 12,000 drum equivalents of TRU waste, are resting safely in bedded salt 2,150 feet (nearly one-half mile) beneath the surface of the New Mexico desert-a rock formation that has not moved since it fonned some 250 million years ago. It took more than 20 years to build, license and open the WIPP as the nation's first deep geologic repository for the permanent disposal of defense-generated TRU waste now stored above ground at 23 sites across the country. As it was throughout those 20 years, safety is the number one priority and most significant achievement as the project moves into its third year of disposal operations.
Key concepts: Radioactive waste, Waste disposal, Waste management, Receipt, License, Containment (computer programming), Environmental science, Environmental restoration