1976Unpublished venueOpen access

Quarterly progress report on fission product release from LWR fuel, October--December 1976

R.A. Lorenz, J.L. Collins, S.R. Manning

Open full text 3 citations

Abstract

The series of Control Tests has been completed. These tests were conducted to evaluate the suitability of the apparatus design, to test the various fission product characterization devices and methods, and to establish the behavior of known chemical species which are expected to be encountered in the latter phases of the program. Those tests which utilized either CsI or Cs/sub 2/O were found to yield deposits of hydrated CsOH in the moist environment. With the completion of the Control Test Series, attention has been turned to the development of an acceptable method of implanting selected fission product forms into the fuel-cladding gap, and to studies of the release of such implanted species from subsequently ruptured capsules. The method of implantation which has been employed in the tests conducted thus far involves application of CsI and CsOH on UO/sub 2/ pellet surfaces from aqueous solution, and implantation of TeO/sub 2/ on the fuel pellet ends from an aqueous slurry. The tests conducted to date indicate some decomposition of CsI to yield elemental iodine, stabilization of the CsOH, probably through reaction with UO/sub 2/, migration of the tellurium to the cladding, and transport of the CsI down temperature gradients within the fuel capsules.

Open-access reader

About this research paper

What this paper is about

The series of Control Tests has been completed. These tests were conducted to evaluate the suitability of the apparatus design, to test the various fission product characterization devices and methods, and to establish the behavior of known chemical species which are expected to be encountered in the latter phases of the program. Those tests which utilized either CsI or Cs/sub 2/O were found to yield deposits of hydrated CsOH in the moist environment. With the completion of the Control Test Series, attention has been turned to the development of an acceptable method of implanting selected fission product forms into the fuel-cladding gap, and to studies of the release of such implanted species from subsequently ruptured capsules. The method of implantation which has been employed in the tests conducted thus far involves application of CsI and CsOH on UO/sub 2/ pellet surfaces from aqueous solution, and implantation of TeO/sub 2/ on the fuel pellet ends from an aqueous slurry. The tests conducted to date indicate some decomposition of CsI to yield elemental iodine, stabilization of the CsOH, probably through reaction with UO/sub 2/, migration of the tellurium to the cladding, and transport of the CsI down temperature gradients within the fuel capsules.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The series of Control Tests has been completed. These tests were conducted to evaluate the suitability of the apparatus design, to test the various fission product characterization devices and methods, and to establish the behavior of known chemical species which are expected to be encountered in the latter phases of the program. Those tests which utilized either CsI or Cs/sub 2/O were found to yield deposits of hydrated CsOH in the moist environment. With the completion of the Control Test Series, attention has been turned to the development of an acceptable method of implanting selected fission product forms into the fuel-cladding gap, and to studies of the release of such implanted species from subsequently ruptured capsules. The method of implantation which has been employed in the tests conducted thus far involves application of CsI and CsOH on UO/sub 2/ pellet surfaces from aqueous solution, and implantation of TeO/sub 2/ on the fuel pellet ends from an aqueous slurry. The tests conducted to date indicate some decomposition of CsI to yield elemental iodine, stabilization of the CsOH, probably through reaction with UO/sub 2/, migration of the tellurium to the cladding, and transport of the CsI down temperature gradients within the fuel capsules.

Key concepts: Nuclear fission product, Cladding (metalworking), Fission products, Fission, Slurry, Materials science, Yield (engineering), Aqueous solution

Related papers

Back to paper searchBrowse research topicsOriginal source
Quarterly progress report on fission product release from LWR fuel, October--December 1976 — Research Paper | ScholarLens