Recent plutonium metal production experience at Hanford

M.W. Gibson, D.H. Nyman

Open full text 2 citations

Abstract

Plutonium metal is produced at the Hanford Site in the Remote Mechanical C (RMC) line. The line is housed in the Plutonium Finishing Plant (PFP). The RMC line was built in the early 1960s and operated until 1973 when it was shut down. The line was restarted in 1985 and has operated on a campaign basis since that time. The fiscal years (FY) 1988/89 RMC line campaigns have shown improved yields and plant safety performance when compared to previous years. This is attributed to numerous process improvements that have been made in the line and to an enhanced standard of disciplined operations. This report discusses the improvements made to the RMC line.

About this research paper

What this paper is about

Plutonium metal is produced at the Hanford Site in the Remote Mechanical C (RMC) line. The line is housed in the Plutonium Finishing Plant (PFP). The RMC line was built in the early 1960s and operated until 1973 when it was shut down. The line was restarted in 1985 and has operated on a campaign basis since that time. The fiscal years (FY) 1988/89 RMC line campaigns have shown improved yields and plant safety performance when compared to previous years. This is attributed to numerous process improvements that have been made in the line and to an enhanced standard of disciplined operations. This report discusses the improvements made to the RMC line.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Plutonium metal is produced at the Hanford Site in the Remote Mechanical C (RMC) line. The line is housed in the Plutonium Finishing Plant (PFP). The RMC line was built in the early 1960s and operated until 1973 when it was shut down. The line was restarted in 1985 and has operated on a campaign basis since that time. The fiscal years (FY) 1988/89 RMC line campaigns have shown improved yields and plant safety performance when compared to previous years. This is attributed to numerous process improvements that have been made in the line and to an enhanced standard of disciplined operations. This report discusses the improvements made to the RMC line.

Key concepts: Plutonium, Glovebox, Hanford Site, Environmental science, Waste management, Calcination, Atmosphere (unit), Radiochemistry