Abstract

A full-scale nonradioactive in-can melter became operational at Pacific Northwest Laboratory in April of 1977. The furnace has six independently controlled hot zones capable of providing 30 kW each at 1200°C and is able to accommodate cans up to 710 mm (28 in.) in diameter and 2.3 m (7½ft) tall. New design concepts such as placing the entire can inside the furnace, supporting the can from the bottom, and charging the in-can melter through a water-cooled spout were demonstrated with this equipment. These new concepts have resulted in the elimination both of accumulations of the materials to be melted (batch) on top of the heat-transfer plates in the cans and of unvitrified waste in the top of the can. Melting rates of 100 kg/h (220 lb/h) were attained in 610-mm-diam (24-in.-diam) cans using test batches composed of calcined simulated waste from a nitric acid solution combined with borosilicate glass-forming frit. A 10-day continuous run was made in conjunction with a heated-wall spray calciner to demonstrate the reliability and operability of the equipment. Control of the in-can melting process using only remote monitoring equipment not attached to the can was also demonstrated.

About this research paper

What this paper is about

A full-scale nonradioactive in-can melter became operational at Pacific Northwest Laboratory in April of 1977. The furnace has six independently controlled hot zones capable of providing 30 kW each at 1200°C and is able to accommodate cans up to 710 mm (28 in.) in diameter and 2.3 m (7½ft) tall. New design concepts such as placing the entire can inside the furnace, supporting the can from the bottom, and charging the in-can melter through a water-cooled spout were demonstrated with this equipment. These new concepts have resulted in the elimination both of accumulations of the materials to be melted (batch) on top of the heat-transfer plates in the cans and of unvitrified waste in the top of the can. Melting rates of 100 kg/h (220 lb/h) were attained in 610-mm-diam (24-in.-diam) cans using test batches composed of calcined simulated waste from a nitric acid solution combined with borosilicate glass-forming frit. A 10-day continuous run was made in conjunction with a heated-wall spray calciner to demonstrate the reliability and operability of the equipment. Control of the in-can melting process using only remote monitoring equipment not attached to the can was also demonstrated.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A full-scale nonradioactive in-can melter became operational at Pacific Northwest Laboratory in April of 1977. The furnace has six independently controlled hot zones capable of providing 30 kW each at 1200°C and is able to accommodate cans up to 710 mm (28 in.) in diameter and 2.3 m (7½ft) tall. New design concepts such as placing the entire can inside the furnace, supporting the can from the bottom, and charging the in-can melter through a water-cooled spout were demonstrated with this equipment. These new concepts have resulted in the elimination both of accumulations of the materials to be melted (batch) on top of the heat-transfer plates in the cans and of unvitrified waste in the top of the can. Melting rates of 100 kg/h (220 lb/h) were attained in 610-mm-diam (24-in.-diam) cans using test batches composed of calcined simulated waste from a nitric acid solution combined with borosilicate glass-forming frit. A 10-day continuous run was made in conjunction with a heated-wall spray calciner to demonstrate the reliability and operability of the equipment. Control of the in-can melting process using only remote monitoring equipment not attached to the can was also demonstrated.

Key concepts: Vitrification, Nuclear engineering, Radioactive waste, Waste management, Environmental science, Materials science, Scale (ratio), Radiochemistry

Related papers

Back to paper searchBrowse research topicsOriginal source
Full-Scale In-Can Melting for Vitrification of Nuclear Wastes — Research Paper | ScholarLens