Installation and initial operation of a 4100 watt wind turbine
H. B. Tryon, T. R. Richards
Abstract
Open-access reader
H. B. Tryon, T. R. Richards
Abstract
Open-access reader
The results are presented of 211 days of operation of the 4.1 kilowatt wind turbine, which was the largest commercially available wind turbine. The wind turbine, electric controls and load bank, and the pivoted tower are described.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The results are presented of 211 days of operation of the 4.1 kilowatt wind turbine, which was the largest commercially available wind turbine. The wind turbine, electric controls and load bank, and the pivoted tower are described.
Key concepts: Turbine, Watt, Tower, Wind power, Marine engineering, Environmental science, Engineering, Automotive engineering