1975•NASA STI Repository (National Aeronautics and Space Administration)Open access

Installation and initial operation of a 4100 watt wind turbine

H. B. Tryon, T. R. Richards

Open full text 1 citations

Abstract

The results are presented of 211 days of operation of the 4.1 kilowatt wind turbine, which was the largest commercially available wind turbine. The wind turbine, electric controls and load bank, and the pivoted tower are described.

Open-access reader

About this research paper

What this paper is about

The results are presented of 211 days of operation of the 4.1 kilowatt wind turbine, which was the largest commercially available wind turbine. The wind turbine, electric controls and load bank, and the pivoted tower are described.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The results are presented of 211 days of operation of the 4.1 kilowatt wind turbine, which was the largest commercially available wind turbine. The wind turbine, electric controls and load bank, and the pivoted tower are described.

Key concepts: Turbine, Watt, Tower, Wind power, Marine engineering, Environmental science, Engineering, Automotive engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Installation and initial operation of a 4100 watt wind turbine — Research Paper | ScholarLens