Conceptual Product Planning
Rose Bannister, Jeanne Paulette Bickford, Haylley M. Johnson
Abstract
Rose Bannister, Jeanne Paulette Bickford, Haylley M. Johnson
Abstract
Semiconductor products have long lead times and complicated Bills of Material, requiring a robust method of planning both capacity requirements and mask builds. Concept Product Planning enables the existing production systems to reserve capacity for new parts prior to completion of the final design using an attributes based system to create representative planning inputs.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Semiconductor products have long lead times and complicated Bills of Material, requiring a robust method of planning both capacity requirements and mask builds. Concept Product Planning enables the existing production systems to reserve capacity for new parts prior to completion of the final design using an attributes based system to create representative planning inputs.
Key concepts: Production planning, Material requirements planning, Capacity planning, Computer science, Product planning, Product (mathematics), Production (economics), Product design