2011Transportation Research Board 90th Annual MeetingTransportation Research BoardRequires access

Deriving Work Zone Capacities from Field Data – Case Studies of I-70 in Missouri

Jalil Kianfar, Praveen Edara, Carlos Sun

Open publisher page 0 citations

Abstract

This paper compares work zone capacity values determined from field data using three methods: (1) maximum sustained flow method, (2) re-scaled cumulative flow curves method, and (3) 85th percentile method. To the authors knowledge, this is the first application of the re-scaled cumulative curves method to work zones. Field data was collected at four short-term 2 to 1 work zones (one lane open out of two lanes) of Interstate 70 in Missouri. The study found the maximum sustained flows decreased as the aggregation interval increased from 5 to 15 minutes. The queue discharge flow (QDF) values were the most conservative estimates of capacity. The 85th percentile flows were lower than the 15-min sustained flow values in all but one location where the 85th percentile flow was slightly higher by 4 passenger cars per hour per lane (vphpl). The pre-queue flow (PQF) values, indicative of near-constant flow prior to breakdown, did not occur in any of the four work zones. This finding has implications on the design of traffic control methods to alleviate work zone congestion. The existence of PQF and its corresponding probability of breakdown have been exploited in the design of ramp metering on freeways. The success of such methods in short-term work zones is questionable due to the absence of PQF. The average capacities obtained by averaging values from all four sites were 1301, 1149, 1267 vphpl, for 15-min sustained flow, QDF, and 85th percentile flow, respectively, which were close to the HCM-based capacity value of 1240 vphpl currently used by Missouri Department of Transportation (DOT).

About this research paper

What this paper is about

This paper compares work zone capacity values determined from field data using three methods: (1) maximum sustained flow method, (2) re-scaled cumulative flow curves method, and (3) 85th percentile method. To the authors knowledge, this is the first application of the re-scaled cumulative curves method to work zones. Field data was collected at four short-term 2 to 1 work zones (one lane open out of two lanes) of Interstate 70 in Missouri. The study found the maximum sustained flows decreased as the aggregation interval increased from 5 to 15 minutes. The queue discharge flow (QDF) values were the most conservative estimates of capacity. The 85th percentile flows were lower than the 15-min sustained flow values in all but one location where the 85th percentile flow was slightly higher by 4 passenger cars per hour per lane (vphpl). The pre-queue flow (PQF) values, indicative of near-constant flow prior to breakdown, did not occur in any of the four work zones. This finding has implications on the design of traffic control methods to alleviate work zone congestion. The existence of PQF and its corresponding probability of breakdown have been exploited in the design of ramp metering on freeways. The success of such methods in short-term work zones is questionable due to the absence of PQF. The average capacities obtained by averaging values from all four sites were 1301, 1149, 1267 vphpl, for 15-min sustained flow, QDF, and 85th percentile flow, respectively, which were close to the HCM-based capacity value of 1240 vphpl currently used by Missouri Department of Transportation (DOT).

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper compares work zone capacity values determined from field data using three methods: (1) maximum sustained flow method, (2) re-scaled cumulative flow curves method, and (3) 85th percentile method. To the authors knowledge, this is the first application of the re-scaled cumulative curves method to work zones. Field data was collected at four short-term 2 to 1 work zones (one lane open out of two lanes) of Interstate 70 in Missouri. The study found the maximum sustained flows decreased as the aggregation interval increased from 5 to 15 minutes. The queue discharge flow (QDF) values were the most conservative estimates of capacity. The 85th percentile flows were lower than the 15-min sustained flow values in all but one location where the 85th percentile flow was slightly higher by 4 passenger cars per hour per lane (vphpl). The pre-queue flow (PQF) values, indicative of near-constant flow prior to breakdown, did not occur in any of the four work zones. This finding has implications on the design of traffic control methods to alleviate work zone congestion. The existence of PQF and its corresponding probability of breakdown have been exploited in the design of ramp metering on freeways. The success of such methods in short-term work zones is questionable due to the absence of PQF. The average capacities obtained by averaging values from all four sites were 1301, 1149, 1267 vphpl, for 15-min sustained flow, QDF, and 85th percentile flow, respectively, which were close to the HCM-based capacity value of 1240 vphpl currently used by Missouri Department of Transportation (DOT).

Key concepts: Percentile, Flow (mathematics), Queue, Work (physics), Statistics, Mathematics, Environmental science, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Deriving Work Zone Capacities from Field Data – Case Studies of I-70 in Missouri — Research Paper | ScholarLens