Construction of the Metro by the Washington Metropolitan Area Transit Authority involves a large amount of cut and cover, soil tunnel, and rock tunnel construction. To aid initial construction and improve future design, performance observations were undertaken on tunnels in the initial construction phase. One part of the program was on the first soft ground tunnel constructed in the system. The tunnel is a 2200-ft (670 m) twin-bore section, designated Contract A-2, in downtown Washington. Two objectives of this program were to determine the relationship of construction procedure to settlements and to observe the pattern of soil movement around the tunnel as an aid in evaluating underpinning criteria for nearby structures. A test section, consisting of three instrument lines located across the tunnel path, was established prior to mining in Lafayette Park to measure in detail both vertical and lateral soil displacements as the tunnel was mined through the section. Load and distortion measurements on the lining were also made within the test section; observations of construction procedure were maintained throughout construction.

About this research paper

What this paper is about

Construction of the Metro by the Washington Metropolitan Area Transit Authority involves a large amount of cut and cover, soil tunnel, and rock tunnel construction. To aid initial construction and improve future design, performance observations were undertaken on tunnels in the initial construction phase. One part of the program was on the first soft ground tunnel constructed in the system. The tunnel is a 2200-ft (670 m) twin-bore section, designated Contract A-2, in downtown Washington. Two objectives of this program were to determine the relationship of construction procedure to settlements and to observe the pattern of soil movement around the tunnel as an aid in evaluating underpinning criteria for nearby structures. A test section, consisting of three instrument lines located across the tunnel path, was established prior to mining in Lafayette Park to measure in detail both vertical and lateral soil displacements as the tunnel was mined through the section. Load and distortion measurements on the lining were also made within the test section; observations of construction procedure were maintained throughout construction.

Why it matters

OpenAlex reports 9 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction of the Metro by the Washington Metropolitan Area Transit Authority involves a large amount of cut and cover, soil tunnel, and rock tunnel construction. To aid initial construction and improve future design, performance observations were undertaken on tunnels in the initial construction phase. One part of the program was on the first soft ground tunnel constructed in the system. The tunnel is a 2200-ft (670 m) twin-bore section, designated Contract A-2, in downtown Washington. Two objectives of this program were to determine the relationship of construction procedure to settlements and to observe the pattern of soil movement around the tunnel as an aid in evaluating underpinning criteria for nearby structures. A test section, consisting of three instrument lines located across the tunnel path, was established prior to mining in Lafayette Park to measure in detail both vertical and lateral soil displacements as the tunnel was mined through the section. Load and distortion measurements on the lining were also made within the test section; observations of construction procedure were maintained throughout construction.

Key concepts: Section (typography), Geotechnical engineering, Downtown, Underpinning, Engineering, Water tunnel, Civil engineering, Geology