1996Civil engineeringRequires access

PORTLAND'S LIGHT RAIL GOES UNDERGROUND

Philip M. Rice, Joseph P. Gildner

Open publisher page 1 citations

Abstract

A 29-km extension of Portland’s first modern light rail system nears completion. The extension includes a 4.6 km twin-tunnel section and the deepest transit station in North America. Light rail is important to the city of Portland. Tri-County Metropolitan Transportation District of Oregon (Tri-Met) operates the Max System, a single-route, 24-km line that runs east from downtown, crossing the Willamette River on the 84-year-old Steel Bridge. In 1993,Tri-Met began construction of the Westside Light Rail Project, 29-km westward extension to the town of Hillsboro. Approximately 4.6 km of twin tunnel carries the alignment through the West Hills, which rise several hundred feet at the edge of the city center. Excavation of the tunnels and Washington Park Station presented major construction and mining challenges.

About this research paper

What this paper is about

A 29-km extension of Portland’s first modern light rail system nears completion. The extension includes a 4.6 km twin-tunnel section and the deepest transit station in North America. Light rail is important to the city of Portland. Tri-County Metropolitan Transportation District of Oregon (Tri-Met) operates the Max System, a single-route, 24-km line that runs east from downtown, crossing the Willamette River on the 84-year-old Steel Bridge. In 1993,Tri-Met began construction of the Westside Light Rail Project, 29-km westward extension to the town of Hillsboro. Approximately 4.6 km of twin tunnel carries the alignment through the West Hills, which rise several hundred feet at the edge of the city center. Excavation of the tunnels and Washington Park Station presented major construction and mining challenges.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A 29-km extension of Portland’s first modern light rail system nears completion. The extension includes a 4.6 km twin-tunnel section and the deepest transit station in North America. Light rail is important to the city of Portland. Tri-County Metropolitan Transportation District of Oregon (Tri-Met) operates the Max System, a single-route, 24-km line that runs east from downtown, crossing the Willamette River on the 84-year-old Steel Bridge. In 1993,Tri-Met began construction of the Westside Light Rail Project, 29-km westward extension to the town of Hillsboro. Approximately 4.6 km of twin tunnel carries the alignment through the West Hills, which rise several hundred feet at the edge of the city center. Excavation of the tunnels and Washington Park Station presented major construction and mining challenges.

Key concepts: Downtown, Light rail transit, Light rail, Excavation, Metropolitan area, Archaeology, Twin cities, Rail transportation

Related papers

Back to paper searchBrowse research topicsOriginal source
PORTLAND'S LIGHT RAIL GOES UNDERGROUND — Research Paper | ScholarLens