Interim Reliability Evaluation Program procedures guide
D.D. Carlson, D.R. Gallup, A.M. Kolaczkowski, G.J. Kolb, D.W. Stack, E.V. Lofgren, W.H. Horton, P.R. Lobner
Abstract
D.D. Carlson, D.R. Gallup, A.M. Kolaczkowski, G.J. Kolb, D.W. Stack, E.V. Lofgren, W.H. Horton, P.R. Lobner
Abstract
This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion.
OpenAlex reports 23 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This document presents procedures for conducting analyses of a scope similar to those performed in Phase II of the Interim Reliability Evaluation Program (IREP). It documents the current state of the art in performing the plant systems analysis portion of a probabilistic risk assessment. Insights gained into managing such an analysis are discussed. Step-by-step procedures and methodological guidance constitute the major portion of the document. While not to be viewed as a cookbook, the procedures set forth the principal steps in performing an IREP analysis. Guidance for resolving the problems encountered in previous analyses is offered. Numerous examples and representative products from previous analyses clarify the discussion.
Key concepts: Interim, Scope (computer science), Reliability (semiconductor), Computer science, Set (abstract data type), Principal (computer security), Probabilistic logic, Risk analysis (engineering)