1992Unpublished venueRequires access

STRENGTHENING AND REFURBISHMENT OF SEVERN CROSSING PART 1. INTRODUCTION

S Chatterjee

Open publisher page 0 citations

Abstract

The structures of the Severn Crossing have been strengthened to provide adequate safety for increased vehicular loading following changes in road transport in the 1970s. There has also been fatigue damage to the steel decks and to the hangers on the Severn Bridge. The paper describes the structural assessments undertaken and outlines the scope of the remedial works which were then planned. The basis for the decision by the Department of Transport to proceed with the work and the organizational strategy adopted are summarised. (A)

About this research paper

What this paper is about

The structures of the Severn Crossing have been strengthened to provide adequate safety for increased vehicular loading following changes in road transport in the 1970s. There has also been fatigue damage to the steel decks and to the hangers on the Severn Bridge. The paper describes the structural assessments undertaken and outlines the scope of the remedial works which were then planned. The basis for the decision by the Department of Transport to proceed with the work and the organizational strategy adopted are summarised. (A)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The structures of the Severn Crossing have been strengthened to provide adequate safety for increased vehicular loading following changes in road transport in the 1970s. There has also been fatigue damage to the steel decks and to the hangers on the Severn Bridge. The paper describes the structural assessments undertaken and outlines the scope of the remedial works which were then planned. The basis for the decision by the Department of Transport to proceed with the work and the organizational strategy adopted are summarised. (A)

Key concepts: Scope (computer science), Remedial education, Engineering, Forensic engineering, Bridge (graph theory), Transport engineering, Work (physics), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
STRENGTHENING AND REFURBISHMENT OF SEVERN CROSSING PART 1. INTRODUCTION — Research Paper | ScholarLens