Precast Options for Bridge Superstructure Design

John R. Fowler, B Stofko

Open publisher page 3 citations

Abstract

Precast construction offers many options for bridge owners and designers: Traditional solutions are I-girders, slab girders and box girders with traditional I-girders being replaced by a new family of more efficient bulb T girders with depths ranging from 1200 to over 2400 mm. Box and trapezoidal girders provide lower span/depth ratios and are more aesthetically pleasing. Each province has their own limitations on the size and weight of bridge members that can be transported by road. Spliced girder construction can be used when these limits are exceeded; here girder elements can achieve spans of 60 to 80 m. Custom solutions can be explored for large projects where the tooling-up costs can be spread over a large number of similar precast concrete components. The fast erection of precast bridge components can speed up bridge construction. Installation in urban areas can occur in off-peak and at night to minimize traffic interruptions. Multiple cranes, barges, temporary bridges, launching trusses can be implemented on difficult sites to help protect the environment. Safe efficient precast concrete construction with built-in durability will ensure the lowest total cost of ownership for the traveling public. For the covering abstract of this conference see ITRD number E

About this research paper

What this paper is about

Precast construction offers many options for bridge owners and designers: Traditional solutions are I-girders, slab girders and box girders with traditional I-girders being replaced by a new family of more efficient bulb T girders with depths ranging from 1200 to over 2400 mm. Box and trapezoidal girders provide lower span/depth ratios and are more aesthetically pleasing. Each province has their own limitations on the size and weight of bridge members that can be transported by road. Spliced girder construction can be used when these limits are exceeded; here girder elements can achieve spans of 60 to 80 m. Custom solutions can be explored for large projects where the tooling-up costs can be spread over a large number of similar precast concrete components. The fast erection of precast bridge components can speed up bridge construction. Installation in urban areas can occur in off-peak and at night to minimize traffic interruptions. Multiple cranes, barges, temporary bridges, launching trusses can be implemented on difficult sites to help protect the environment. Safe efficient precast concrete construction with built-in durability will ensure the lowest total cost of ownership for the traveling public. For the covering abstract of this conference see ITRD number E

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Precast construction offers many options for bridge owners and designers: Traditional solutions are I-girders, slab girders and box girders with traditional I-girders being replaced by a new family of more efficient bulb T girders with depths ranging from 1200 to over 2400 mm. Box and trapezoidal girders provide lower span/depth ratios and are more aesthetically pleasing. Each province has their own limitations on the size and weight of bridge members that can be transported by road. Spliced girder construction can be used when these limits are exceeded; here girder elements can achieve spans of 60 to 80 m. Custom solutions can be explored for large projects where the tooling-up costs can be spread over a large number of similar precast concrete components. The fast erection of precast bridge components can speed up bridge construction. Installation in urban areas can occur in off-peak and at night to minimize traffic interruptions. Multiple cranes, barges, temporary bridges, launching trusses can be implemented on difficult sites to help protect the environment. Safe efficient precast concrete construction with built-in durability will ensure the lowest total cost of ownership for the traveling public. For the covering abstract of this conference see ITRD number E

Key concepts: Precast concrete, Girder, Bridge (graph theory), Engineering, Truss, Span (engineering), Structural engineering, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Precast Options for Bridge Superstructure Design — Research Paper | ScholarLens