Effluent versus inlet header break analysis for SRS-reactor LOPA scenario

Pran K. Paul, K.L. Barbour, D.T. Herman

Open full text 0 citations

Abstract

The Loss-of-Pumping Accident (LOPA) is a design basis accident for the Savannah River Site (SRS) reactors. The LOPA is defined as a Double Ended Guillotine Break (DEGB) in a secondary cooling water pipe. The secondary cooling line break is termed inlet or effluent depending on break location. Upon break detection emergency shut down procedure begins, the reactor scrams, secondary cooling pump motors trip off, primary cooling pump AC motors switch off, and DC motor drive engages. Secondary cooling gravity flow continues flooding the building after secondary cooling pumps are off. The Emergency Cooling System (ECS) activates before the DC motors flood out. Break detection time, header flooding rate, and flooding locations are different for the inlet and effluent header breaks due to different break locations. Inlet and effluent header break primary coolant temperature transients differ because primary and secondary cooling pumps continue during a break detection and reactor scram time delay for the effluent header case, whereas the pumps trip off almost immediately for the inlet header case. Design basis accident reactor core power limits are calculated for both the inlet and effluent header breaks.

Open-access reader

About this research paper

What this paper is about

The Loss-of-Pumping Accident (LOPA) is a design basis accident for the Savannah River Site (SRS) reactors. The LOPA is defined as a Double Ended Guillotine Break (DEGB) in a secondary cooling water pipe. The secondary cooling line break is termed inlet or effluent depending on break location. Upon break detection emergency shut down procedure begins, the reactor scrams, secondary cooling pump motors trip off, primary cooling pump AC motors switch off, and DC motor drive engages. Secondary cooling gravity flow continues flooding the building after secondary cooling pumps are off. The Emergency Cooling System (ECS) activates before the DC motors flood out. Break detection time, header flooding rate, and flooding locations are different for the inlet and effluent header breaks due to different break locations. Inlet and effluent header break primary coolant temperature transients differ because primary and secondary cooling pumps continue during a break detection and reactor scram time delay for the effluent header case, whereas the pumps trip off almost immediately for the inlet header case. Design basis accident reactor core power limits are calculated for both the inlet and effluent header breaks.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Loss-of-Pumping Accident (LOPA) is a design basis accident for the Savannah River Site (SRS) reactors. The LOPA is defined as a Double Ended Guillotine Break (DEGB) in a secondary cooling water pipe. The secondary cooling line break is termed inlet or effluent depending on break location. Upon break detection emergency shut down procedure begins, the reactor scrams, secondary cooling pump motors trip off, primary cooling pump AC motors switch off, and DC motor drive engages. Secondary cooling gravity flow continues flooding the building after secondary cooling pumps are off. The Emergency Cooling System (ECS) activates before the DC motors flood out. Break detection time, header flooding rate, and flooding locations are different for the inlet and effluent header breaks due to different break locations. Inlet and effluent header break primary coolant temperature transients differ because primary and secondary cooling pumps continue during a break detection and reactor scram time delay for the effluent header case, whereas the pumps trip off almost immediately for the inlet header case. Design basis accident reactor core power limits are calculated for both the inlet and effluent header breaks.

Key concepts: Header, Effluent, Inlet, Computer science, Process engineering, Environmental science, Waste management, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Effluent versus inlet header break analysis for SRS-reactor LOPA scenario — Research Paper | ScholarLens