EVALUATION OF HIGH-OCCUPANCY VEHICLE PRIORITY TREATMENT PROJECTS (STUDY PLAN AND INITIAL 6-MONTH PRELIMINARY ANALYSIS)
N M Kuo, J M Mounce
Abstract
N M Kuo, J M Mounce
Abstract
This report presents the study plan for the evaluation of three high occupancy vehicle facilities currently being developed in Houston, Texas. Preliminary analyses of data from the first six months of the study are presented. These data include park-and-ride demands, travel times and vehicle and person demands for the three freeway corridors studied. Operational data will continue to be collected within the study corridors both monthly and quarterly throughout the evaluation period (five years). (Author)
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This report presents the study plan for the evaluation of three high occupancy vehicle facilities currently being developed in Houston, Texas. Preliminary analyses of data from the first six months of the study are presented. These data include park-and-ride demands, travel times and vehicle and person demands for the three freeway corridors studied. Operational data will continue to be collected within the study corridors both monthly and quarterly throughout the evaluation period (five years). (Author)
Key concepts: Occupancy, Plan (archaeology), Transport engineering, Engineering, Geography, Civil engineering, Archaeology