1986•NASA Technical Reports Server (NASA)Requires access

Operating envelope charts for the Langley 0.3-meter transonic cryogenic wind tunnel

Robert Ralló, David A. Dress, H. J. A. Siegle

Open publisher page 18 citations

Abstract

To take full advantage of the unique Reynolds number capabilities of the 0.3-meter Transonic Cryogenic Tunnel (0.3-m TCT) at the NASA Langley Research Center, it was designed to accommodate test sections other than the original, octagonal, three-dimensional test section. A 20- by 60-cm two-dimensional test section was installed in 1976 and was extensively used, primarily for airfoil testing, through the fall of 1984. The tunnel was inactive during 1985 so that a new test section and improved high speed diffuser could be installed in the tunnel circuit. The new test section has solid adaptive top and bottom walls to reduce or eliminate wall interference for two-dimensional testing. The test section is 33- by 33-cm in cross section at the entrance and is 142 cm long. In the planning and running of past airfoil tests in the 0.3-m TCT, the use of operating envelope charts have proven very useful. These charts give the variation of total temperature and pressure with Mach number and Reynolds number. The operating total temperature range of the 0.3-m TCT is from about 78 K to 327 K with total pressures ranging from about 17.5 psia to 88 psia. This report presents the operating envelope charts for the 0.3-m TCT with the adaptive wall tes t section installed. They were all generated based on a 1-foot chord model. The Mach numbers vary from 0.1 to 0.95.

About this research paper

What this paper is about

To take full advantage of the unique Reynolds number capabilities of the 0.3-meter Transonic Cryogenic Tunnel (0.3-m TCT) at the NASA Langley Research Center, it was designed to accommodate test sections other than the original, octagonal, three-dimensional test section. A 20- by 60-cm two-dimensional test section was installed in 1976 and was extensively used, primarily for airfoil testing, through the fall of 1984. The tunnel was inactive during 1985 so that a new test section and improved high speed diffuser could be installed in the tunnel circuit. The new test section has solid adaptive top and bottom walls to reduce or eliminate wall interference for two-dimensional testing. The test section is 33- by 33-cm in cross section at the entrance and is 142 cm long. In the planning and running of past airfoil tests in the 0.3-m TCT, the use of operating envelope charts have proven very useful. These charts give the variation of total temperature and pressure with Mach number and Reynolds number. The operating total temperature range of the 0.3-m TCT is from about 78 K to 327 K with total pressures ranging from about 17.5 psia to 88 psia. This report presents the operating envelope charts for the 0.3-m TCT with the adaptive wall tes t section installed. They were all generated based on a 1-foot chord model. The Mach numbers vary from 0.1 to 0.95.

Why it matters

OpenAlex reports 18 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To take full advantage of the unique Reynolds number capabilities of the 0.3-meter Transonic Cryogenic Tunnel (0.3-m TCT) at the NASA Langley Research Center, it was designed to accommodate test sections other than the original, octagonal, three-dimensional test section. A 20- by 60-cm two-dimensional test section was installed in 1976 and was extensively used, primarily for airfoil testing, through the fall of 1984. The tunnel was inactive during 1985 so that a new test section and improved high speed diffuser could be installed in the tunnel circuit. The new test section has solid adaptive top and bottom walls to reduce or eliminate wall interference for two-dimensional testing. The test section is 33- by 33-cm in cross section at the entrance and is 142 cm long. In the planning and running of past airfoil tests in the 0.3-m TCT, the use of operating envelope charts have proven very useful. These charts give the variation of total temperature and pressure with Mach number and Reynolds number. The operating total temperature range of the 0.3-m TCT is from about 78 K to 327 K with total pressures ranging from about 17.5 psia to 88 psia. This report presents the operating envelope charts for the 0.3-m TCT with the adaptive wall tes t section installed. They were all generated based on a 1-foot chord model. The Mach numbers vary from 0.1 to 0.95.

Key concepts: Transonic, Wind tunnel, Mach number, Subsonic and transonic wind tunnel, Airfoil, Hypersonic wind tunnel, Chord (peer-to-peer), Reynolds number

Related papers

Back to paper searchBrowse research topicsOriginal source
Operating envelope charts for the Langley 0.3-meter transonic cryogenic wind tunnel — Research Paper | ScholarLens