1973Unpublished venueRequires access

DEVELOPMENT OF AN IMPROVED CONTRACTION JOINT FOR PORTLAND CEMENT CONCRETE PAVEMENTS

J P Cook, I Minkaiah

Open publisher page 0 citations

Abstract

THIS REPORT DEALS WITH THE CONTRACTION JOINTS IN PORTLAND CEMENT CONCRETE PAVEMENT. THE VARIABLES STUDIED WHICH AFFECT JOINT BEHAVIOR ARE 1) JOINT SPACING, 2) SUB-BASE STABILIZATION, 3) COATING OF DOWEL BARS, 4) CONFIGURATION OF THE SAWCUT, AND 5) USE OF SKEWED JOINTS. HAND GAGE READINGS, TAKEN MONTHLY, GIVE THE YEARLY CURVE OF JOINT MOVEMENT. ELECTRONIC INSTRUMENTATION IS USED TO GIVE A CONTINUOUS RECORD OF THE DAILY SLAB MOVEMENTS. ELECTRONIC INSTRUMENTATION IS USED TO MEASURE PAVEMENT DEFLECTION UNDER KNOWN AXLE LOADS. A CONDITION REPORT OF THE PAVEMENT AFTER ONE YEAR'S USE IS INCLUDED AND TENTATIVE RECOMMENDATIONS ARE MADE FOR AN IMPROVED CONTRACTION JOINT.

About this research paper

What this paper is about

THIS REPORT DEALS WITH THE CONTRACTION JOINTS IN PORTLAND CEMENT CONCRETE PAVEMENT. THE VARIABLES STUDIED WHICH AFFECT JOINT BEHAVIOR ARE 1) JOINT SPACING, 2) SUB-BASE STABILIZATION, 3) COATING OF DOWEL BARS, 4) CONFIGURATION OF THE SAWCUT, AND 5) USE OF SKEWED JOINTS. HAND GAGE READINGS, TAKEN MONTHLY, GIVE THE YEARLY CURVE OF JOINT MOVEMENT. ELECTRONIC INSTRUMENTATION IS USED TO GIVE A CONTINUOUS RECORD OF THE DAILY SLAB MOVEMENTS. ELECTRONIC INSTRUMENTATION IS USED TO MEASURE PAVEMENT DEFLECTION UNDER KNOWN AXLE LOADS. A CONDITION REPORT OF THE PAVEMENT AFTER ONE YEAR'S USE IS INCLUDED AND TENTATIVE RECOMMENDATIONS ARE MADE FOR AN IMPROVED CONTRACTION JOINT.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

THIS REPORT DEALS WITH THE CONTRACTION JOINTS IN PORTLAND CEMENT CONCRETE PAVEMENT. THE VARIABLES STUDIED WHICH AFFECT JOINT BEHAVIOR ARE 1) JOINT SPACING, 2) SUB-BASE STABILIZATION, 3) COATING OF DOWEL BARS, 4) CONFIGURATION OF THE SAWCUT, AND 5) USE OF SKEWED JOINTS. HAND GAGE READINGS, TAKEN MONTHLY, GIVE THE YEARLY CURVE OF JOINT MOVEMENT. ELECTRONIC INSTRUMENTATION IS USED TO GIVE A CONTINUOUS RECORD OF THE DAILY SLAB MOVEMENTS. ELECTRONIC INSTRUMENTATION IS USED TO MEASURE PAVEMENT DEFLECTION UNDER KNOWN AXLE LOADS. A CONDITION REPORT OF THE PAVEMENT AFTER ONE YEAR'S USE IS INCLUDED AND TENTATIVE RECOMMENDATIONS ARE MADE FOR AN IMPROVED CONTRACTION JOINT.

Key concepts: Dowel, Portland cement, Deflection (physics), Structural engineering, Slab, Joint (building), Engineering, Cement