Unit undergoes controls upgrade to meet cycling needs

Bert E. Weston, Russ Tinkham, J. Chloupek

Open publisher page 0 citations

Abstract

New England Electric System's Brayton Point Unit 3, Somerset, Mass, along with many other units in the US, has been forced into cycling operation on a much more frequent basis than was intended when the original controls were installed. Low-load operation and lengthy startup times also had to be addressed. An integrated control and monitoring system installed at Unit 3 to handle the boiler/turbine controls, burner management, and equipment monitoring functions. New strategies, particularly with the startup valves, were implemented to provide faster, safer, and more economical startups. The retrofit has been a success, with marked improvement in both startup and operation.

About this research paper

What this paper is about

New England Electric System's Brayton Point Unit 3, Somerset, Mass, along with many other units in the US, has been forced into cycling operation on a much more frequent basis than was intended when the original controls were installed. Low-load operation and lengthy startup times also had to be addressed. An integrated control and monitoring system installed at Unit 3 to handle the boiler/turbine controls, burner management, and equipment monitoring functions. New strategies, particularly with the startup valves, were implemented to provide faster, safer, and more economical startups. The retrofit has been a success, with marked improvement in both startup and operation.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

New England Electric System's Brayton Point Unit 3, Somerset, Mass, along with many other units in the US, has been forced into cycling operation on a much more frequent basis than was intended when the original controls were installed. Low-load operation and lengthy startup times also had to be addressed. An integrated control and monitoring system installed at Unit 3 to handle the boiler/turbine controls, burner management, and equipment monitoring functions. New strategies, particularly with the startup valves, were implemented to provide faster, safer, and more economical startups. The retrofit has been a success, with marked improvement in both startup and operation.

Key concepts: Upgrade, Engineering, Unit (ring theory), Boiler (water heating), Combustor, Siemens, SAFER, Automotive engineering