Status of Linac4 Construction at CERN

M. Vretenar

Open full text 7 citations

Abstract

Linac4 is a 160 MeV normal-conducting H¯ linear accelerator which is being built at CERN in the frame of a program for increasing the luminosity of the LHC. The project started in 2008 and delivery of beam to the CERN accelerator chain is foreseen from early 2015. The new linac will be housed in an underground tunnel close to the present Linac2; a surface building will house RF and other infrastructure. The civil engineering work started in October 2008 will be soon completed. Installation of the infrastructure will take place in 2011, and from 2012 will be installed the main machine elements. The ion source is presently operational on a test stand, where it will be followed in 2011 by a 3 MeV RFQ under construction in the CERN workshops. Prototypes of the three different types of accelerating structures have been tested; construction of the 22 accelerating cavities has started, supported by a network of agreements with external laboratories and institutions. Commissioning will take place in stages, starting from January 2013. Starting in March 2014 is foreseen a sixmonth reliability run, in preparation for Linac4 role as the new source of particles for the CERN complex.

Open-access reader

About this research paper

What this paper is about

Linac4 is a 160 MeV normal-conducting H¯ linear accelerator which is being built at CERN in the frame of a program for increasing the luminosity of the LHC. The project started in 2008 and delivery of beam to the CERN accelerator chain is foreseen from early 2015. The new linac will be housed in an underground tunnel close to the present Linac2; a surface building will house RF and other infrastructure. The civil engineering work started in October 2008 will be soon completed. Installation of the infrastructure will take place in 2011, and from 2012 will be installed the main machine elements. The ion source is presently operational on a test stand, where it will be followed in 2011 by a 3 MeV RFQ under construction in the CERN workshops. Prototypes of the three different types of accelerating structures have been tested; construction of the 22 accelerating cavities has started, supported by a network of agreements with external laboratories and institutions. Commissioning will take place in stages, starting from January 2013. Starting in March 2014 is foreseen a sixmonth reliability run, in preparation for Linac4 role as the new source of particles for the CERN complex.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Linac4 is a 160 MeV normal-conducting H¯ linear accelerator which is being built at CERN in the frame of a program for increasing the luminosity of the LHC. The project started in 2008 and delivery of beam to the CERN accelerator chain is foreseen from early 2015. The new linac will be housed in an underground tunnel close to the present Linac2; a surface building will house RF and other infrastructure. The civil engineering work started in October 2008 will be soon completed. Installation of the infrastructure will take place in 2011, and from 2012 will be installed the main machine elements. The ion source is presently operational on a test stand, where it will be followed in 2011 by a 3 MeV RFQ under construction in the CERN workshops. Prototypes of the three different types of accelerating structures have been tested; construction of the 22 accelerating cavities has started, supported by a network of agreements with external laboratories and institutions. Commissioning will take place in stages, starting from January 2013. Starting in March 2014 is foreseen a sixmonth reliability run, in preparation for Linac4 role as the new source of particles for the CERN complex.

Key concepts: Large Hadron Collider, Proton Synchrotron, Super Proton Synchrotron, Physics, Linear particle accelerator, Nuclear physics, Synchrotron, Particle accelerator

Related papers

Back to paper searchBrowse research topicsOriginal source
Status of Linac4 Construction at CERN — Research Paper | ScholarLens