Water chemistry experience in current low-crud boiling water reactors
Keiichi Otoha, Shinya Yoshikawa, Yutaka Suzuki, Katsumi Ohsumi, Masayoshi Miki, Yusuke Asakura, Shunsuke Uchida
Abstract
Keiichi Otoha, Shinya Yoshikawa, Yutaka Suzuki, Katsumi Ohsumi, Masayoshi Miki, Yusuke Asakura, Shunsuke Uchida
Abstract
The first Japanese standard boiling water reactor (BWR), Unit 2 of Fukushima-Daini nuclear power plant (2F-2; 1100 MW(e)), operated commercially for 10,320 effective full-power hours for its first fuel cycle. During the first fuel cycle period, water chemistry data were collected and evaluated, which suggested a low shutdown dose rate around the primary systems. The estimation was confirmed by the measured dose rate after the scheduled shutdown in January 1985.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The first Japanese standard boiling water reactor (BWR), Unit 2 of Fukushima-Daini nuclear power plant (2F-2; 1100 MW(e)), operated commercially for 10,320 effective full-power hours for its first fuel cycle. During the first fuel cycle period, water chemistry data were collected and evaluated, which suggested a low shutdown dose rate around the primary systems. The estimation was confirmed by the measured dose rate after the scheduled shutdown in January 1985.
Key concepts: Shutdown, Boiling water reactor, Boiling, Nuclear engineering, Environmental science, Pressurized water reactor, Waste management, Water chemistry