Probabilistic risk assessment (PRA) techniques and the lessons learned from previous PRA studies were used to evaluate the effectiveness of various design alternatives for the Westinghouse advanced pressurized water reactor design. This evaluation was done successfully at the design state prior to the licensing stage and is probably the first example of such an application for a nuclear power plant design. Three measures of risk were utilized: plant core melt frequency per year, severe fission product release frequency per year, and economic risk to the plant owner in terms of present day dollars.

About this research paper

What this paper is about

Probabilistic risk assessment (PRA) techniques and the lessons learned from previous PRA studies were used to evaluate the effectiveness of various design alternatives for the Westinghouse advanced pressurized water reactor design. This evaluation was done successfully at the design state prior to the licensing stage and is probably the first example of such an application for a nuclear power plant design. Three measures of risk were utilized: plant core melt frequency per year, severe fission product release frequency per year, and economic risk to the plant owner in terms of present day dollars.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Probabilistic risk assessment (PRA) techniques and the lessons learned from previous PRA studies were used to evaluate the effectiveness of various design alternatives for the Westinghouse advanced pressurized water reactor design. This evaluation was done successfully at the design state prior to the licensing stage and is probably the first example of such an application for a nuclear power plant design. Three measures of risk were utilized: plant core melt frequency per year, severe fission product release frequency per year, and economic risk to the plant owner in terms of present day dollars.

Key concepts: Nuclear power plant, Probabilistic risk assessment, Probabilistic logic, Nuclear fission product, Risk assessment, Pressurized water reactor, Risk analysis (engineering), Nuclear engineering