Leading the Way for Mid-Tier Shipyards to Implement Design for Production Methodologies
Victoria Dlugokecki, Dennis Fanguy, Lisa Hepinstall
Abstract
Victoria Dlugokecki, Dennis Fanguy, Lisa Hepinstall
Abstract
In February 2007, NSRP awarded the project entitled “Design for Producibility (DFP) for Mid-Tiered Shipyards,” a collaborative research project which included Bollinger, Atlantic Marine, and Todd Pacific Shipyards. The purpose of the project was to incorporate DFP methodologies into the ship design process for each of the participating midtiered shipyards to enable simplification of the ship design process and vessel construction requirements. This paper will provide an understanding of the process used to develop the shipyard-specific DFP information. The paper will also provide a quantification and appreciation of the resulting cost benefits associated with the implementation of DFP principles at each of the participating shipyards. New construction programs in each of the shipyards enabled real-time metrics to be captured, illustrating the achievement of cost reduction opportunities resulting from DFP implementation.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In February 2007, NSRP awarded the project entitled “Design for Producibility (DFP) for Mid-Tiered Shipyards,” a collaborative research project which included Bollinger, Atlantic Marine, and Todd Pacific Shipyards. The purpose of the project was to incorporate DFP methodologies into the ship design process for each of the participating midtiered shipyards to enable simplification of the ship design process and vessel construction requirements. This paper will provide an understanding of the process used to develop the shipyard-specific DFP information. The paper will also provide a quantification and appreciation of the resulting cost benefits associated with the implementation of DFP principles at each of the participating shipyards. New construction programs in each of the shipyards enabled real-time metrics to be captured, illustrating the achievement of cost reduction opportunities resulting from DFP implementation.
Key concepts: Shipyard, Shipbuilding, Process (computing), Naval architecture, Engineering, Manufacturing engineering, Production (economics), Engineering management